Project Statement
The Rauje Khola Hydropower Project (18.6 MW) is currently under construction at Solududhkunda Municipality–01, Solukhumbu, Nepal. The project is being developed by Hydro Connection Pvt. Ltd., with design and supervision by CEPAD Hydro Consultant Pvt. Ltd., and the construction works are being executed by Dreamland Construction Pvt. Ltd.
The project includes a tunnel of size 3.20 m × 3.20 m with a total planned length of 1000 meters. As per the latest progress update, 434 meters of tunnel excavation has been successfully completed.
This represents an overall physical progress of 43.40%, indicating that the project is progressing steadily. The project is currently ongoing, with the remaining works focused on completing the balance tunnel excavation and associated construction activities.
We would like to express our sincere appreciation for the opportunity to be part of this project and remain committed to delivering the work with quality, safety, and within the stipulated timeline.