RTR Solutions AS
04/05/2014
A selection of Subsea Wellhead System and CAN configurations
20/04/2014
Stack-up drawing covers the FMC, Production, Enhanced Horizontal Xmas Tree (EHXT) installed on the Template Style FMC, 18-3/4" UWD-15, Rigid Lockdown Wellhead System. — at BG Norge, Løkkenveien 111, Stavanger, Norway
19/01/2014
FMC, Water Injection EHXT c/w Tubing Hanger Running Tool, Tubing Hanger and Expro´s Lower Landing String Assembly.
All running interfaces and operational tolerances checked out ahead of equipment mobilisation activities.
14/10/2013
Latest project delivered ahead of Spudding of a new well. All Interface Engineering carried out on time and within Budget.
Surface Well Control Equipment and Plexus 18-3/4" Surface Wellhead Equipment on the Mærsk Giant
Klikk her for å få din Sponsede Oppføring.
Type
Kontakt bedriften
Telefon
Nettsted
Adresse
Tananger Ring 292
Tananger
4056
Åpningstider
| Mandag | 08:00 - 18:00 |
| Tirsdag | 08:00 - 18:00 |
| Onsdag | 08:00 - 18:00 |
| Torsdag | 08:00 - 18:00 |
| Fredag | 08:00 - 18:00 |
| Lørdag | 08:00 - 18:00 |
| Søndag | 08:00 - 18:00 |