ACIS

ACIS

Share

01/04/2026

Bridge construction in the sea.

Photos from ACIS's post 13/03/2026

Quality control and quality assurance duties.

Photos from ACIS's post 20/02/2026

Insitu dry density test on compacted sub base.
This is done to check the degree of compaction achieved on the site of a road project.
The test is a quality control measure to improve the integrity of our road infrastructure.

Photos from ACIS's post 19/02/2026

Geotechnical site investigation for a virgin road project.

This is one of the earliest activities on a road alignment after preliminary,reconnaissance and final survey in the sequence of activities on a road project.
Geotechnical site investigation is a quality control measure to ensure the integrity of our infrastructure.
Soil samples were collected depth at intervals of 150m along the road alignment and will be taken to the laboratory for analysis where the California bearing ratio (CBR) will be analysed. This exercise will determine the volume of earthwork and also the quality of the fill material.

Photos from ACIS's post 12/02/2026

Civil engineering practice.
Highway engineering.

Photos from ACIS's post 11/02/2026

Bridge engineering.

Photos from Civil Engineering Discoveries's post 27/12/2025

Clean floor finishes.

27/12/2025

The future of construction.
Integration of drones will undoubtedly improve the accuracy and precision of setting out operation.

24/12/2025

Common roof types.

Slope Base Four Type Of Roof Overview

24/12/2025

Modern gate design and construction.

Want your business to be the top-listed Engineering Company in Uyo?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


No. 22 Mbak Road Uyo
Uyo