Engr gelexy
07/06/2026
Classic 3 bedroom ensuite
07/06/2026
Modern luxury design
Team work in construction site is One of the amazing skills one must have
To enable peaceful construction environment
With this you feel love in your workplace
Thanks you All for building a better tomorrow β€οΈπ₯½π₯³
07/06/2026
distinctive feature of a four-bedroom en-suite π π‘π’
06/06/2026
4 Bedroom Floor plan , all Ensuite π π‘πͺπ€
second floor preparation crew active π¨πΌπ¨πͺ
06/06/2026
3 bedrooms
05/06/2026
We provide quality construction for every project. we design, we build and we pay attention to every detail. Contact us today for your building design and project management. ποΈπͺπΌππ
05/06/2026
Concrete Mix Formula ποΈ
The basic 1 : 4 : 6 mix ratio shown here:
1 Bag Cement β the binder
4 Buckets Sand β fine aggregate
6 Buckets Gravel β coarse aggregate
This is a lean mix, suitable for general/mass concrete work like blinding or non-structural fills. For structural columns (as shown), a stronger mix like 1:2:4 or 1:1.5:3 is typically required per ACI 318, achieving f'c = 3,000β4,000 psi (21β28 MPa) minimum.
β οΈ Always design your mix based on required compressive strength, not just volumetric ratios.
05/06/2026
Contact us
We are always active and ready
Click here to claim your Sponsored Listing.
Category
Address
Independence Layout