Mygom.tech
01/06/2026
Most teams track the keywords they WANT to rank for.
Nobody tracks the ones they're already ranking for.
That's where the real money is.
Right now, Google Search Console is showing you queries where you're getting impressions - real searches, real people, but you're sitting at position 11, 14, 19.
You're one optimized page away from page 1.
But because those keywords aren't in your tracking list, you never see them. You keep creating new content instead of fixing what's already working.
This is the GSC gap. And it's costing you traffic every single week.
MygomSEO connects to your GSC, automatically surfaces untracked queries, and tells you exactly which pages to optimize to capture that traffic.
No manual digging. No spreadsheets. Just - here's your opportunity, here's the page, here's what to fix.
The keywords you're ignoring are worth more than the ones you're chasing.
22/05/2026
We built an internal AI tool that writes our proposals.
Before it existed, every proposal took 3-4 hours. Quality depended on who had time that day. Pricing was pulled manually from spreadsheets. Structure was copy-pasted from old proposals and adjusted by hand.
Now it takes 30-60 minutes. The structure is consistent. The pricing is accurate. The tone is ours.
The tool generates three document types - Commercial Proposal, Technical Specification, and Public Procurement Technical Specification.
It asks clarifying questions before writing anything - scope, integrations, and hosting requirements. Then it writes the proposal section by section.
It knows our rates. It knows our format. It learned from proposals that already won us clients.
Every proposal now represents us the way it should.
If you're running a dev agency or building a sales process, this is the kind of tool that saves time on every single deal.
Full breakdown in the comments.
15/05/2026
A steel manufacturer was losing 3 hours per production manager per day.
Not to machine downtime. Not to supply chain issues.
To spreadsheets.
Excel files tracking material requests, warehouse locations, supplier bids, and on-site usage. Dozens of them. Updated manually. Always slightly wrong.
By the time a manager had accurate data, the factory floor had already moved on.
Here's what we built in one sprint:
End-to-end material request flow - from project kickoff to final delivery, logged in one place
Built-in supplier bidding - teams invite bids, compare, and approve without leaving the platform
Real-time material tracking - every delivery, every warehouse movement, every on-site usage, captured as it happens
No more chasing spreadsheets. No more "which version is current?"
The results:
15% increase in production throughput
35% faster material picking and dispatch
3 hours saved per production manager, per day
One connected platform replaced a dozen disconnected workflows.
The factory didn't need more automation tools. It needed one system that actually reflected reality.
What's your biggest operational bottleneck right now?
13/05/2026
If you're using Claude or Cursor for SEO, there's a better way.
MygomSEO now connects directly to your AI - no more copy-pasting audit reports.
Real data.
Structured findings.
Actual fixes.
Full breakdown in the comments.
Click here to claim your Sponsored Listing.
Category
Website
Address
Šiaurės Prospektas 99A
Kaunas
49238