Salcef Group
10/05/2026
๐โโ๏ธ ๐๐ ๐ฅ๐ฎ๐ฐ๐ฒ ๐ณ๐ผ๐ฟ ๐๐ต๐ฒ ๐๐๐ฟ๐ฒ ๐ฎ๐ฌ๐ฎ๐ฒ
Today we took part in Race for the Cure 2026 in Rome.
Our team joined the 5 km run and walk at Circo Massimo, together with colleagues, families and friends, sharing a meaningful day in support of an important cause.
07/05/2026
๐๏ธ ๐ฅ๐ฎ๐ฐ๐ฒ ๐ณ๐ผ๐ฟ ๐๐ต๐ฒ ๐๐๐ฟ๐ฒ ๐ฎ๐ฌ๐ฎ๐ฒ
From 7 to 10 May, Rome will host Race for the Cure 2026, the initiative by Komen Italia dedicated to the fight against breast cancer.
We are proud to support this important event and to join the 5 km run and walk at Circo Massimo on 10 May.
12/04/2026
๐ฅ ๐๐ฟ๐ผ๐บ ๐ผ๐๐ฟ ๐๐ผ๐ฟ๐ธ๐๐ถ๐๐ฒ๐ ๐๐ผ ๐บ๐ถ๐ป๐ถ๐ฎ๐๐๐ฟ๐ฒ ๐บ๐ผ๐ฑ๐ฒ๐น๐
Some of the large yellow railway maintenance machines built by SRT and used every day on our construction sites have been recreated in 5-inch gauge scale by Italian model maker Gabriele Lisetti.
In ๐ฃ๐ผ๐ฐ๐ธ๐ฒ๐ ๐ง๐ฟ๐ฎ๐ถ๐ป๐ โ ๐ง๐ต๐ฒ ๐๐ฟ๐ฎ๐ณ๐๐๐บ๐ฎ๐ป ๐ผ๐ณ ๐ ๐ถ๐ป๐ถ๐ฎ๐๐๐ฟ๐ฒ ๐ฆ๐๐ฒ๐ฒ๐น, Lisetti shares his passion for railway modelling and the careful research, precision and craftsmanship behind models inspired by real railway work vehicles.
A miniature tribute to the vehicles that support our work on site every day.
Watch the video on SRTโs YouTube channel: https://youtu.be/kwF_7nK94mc?si=Kc9atx3XlWQMAclD
๐ฌ๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐.
Treni in tasca | Gabriele Lisetti - L'artigiano del ferro in miniatura Discover how SRT railway maintenance machines become miniature masterpieces.English subtitles available.In Pocket Trains โ The Craftsman of Miniature Steel, ...
๐ฐ ๐ง๐ถ๐น๐ฒ๐ฎ๐ด๐ฑ-๐ข๐๐ผ๐ฟ๐ต๐ฒ๐ถ ๐๐ฒ๐ฐ๐๐ถ๐ผ๐ป ๐ฟ๐ฒ๐ผ๐ฝ๐ฒ๐ป๐ฒ๐ฑ ๐๐ผ ๐๐ฟ๐ฎ๐ณ๐ณ๐ถ๐ฐ
Today, 31 March 2026, traffic is running again on the Tileagd-Osorhei railway section (Romania).
Our teams worked along the line and at Osorhei station, delivering a full track renewal with more than 9 km of track renewed, new turnouts installed and a new alignment connecting the upgraded section to the existing line.
A great result achieved on site.
24/03/2026
๐ฐ ๐ฉ๐ฒ๐ฟ๐ผ๐ป๐ฎ-๐ฃ๐ฎ๐ฑ๐๐ฎ ๐ต๐ถ๐ด๐ต-๐๐ฝ๐ฒ๐ฒ๐ฑ ๐น๐ถ๐ป๐ฒ: ๐ฎ ๐ป๐ฒ๐ ๐บ๐ถ๐น๐ฒ๐๐๐ผ๐ป๐ฒ
In just ๐๐ถ๐
๐บ๐ผ๐ป๐๐ต๐, we completed track construction along the entire Verona-Bivio Vicenza section โ ๐ด๐ด ๐ธ๐บ ๐ผ๐ณ ๐๐ฟ๐ฎ๐ฐ๐ธ and 20 turnouts.
A result built day by day by our teams on site, combining expertise, coordination and advanced mechanized construction, including the use of the MCB01 track-laying train.
This is one more step forward in the development of the Milan-Venice corridor, part of the TEN-T network, helping shape faster and more sustainable rail connections.
๐ฅ Watch the video https://youtu.be/XpuTWKcBDFY
Owner: RFI S.p.A.
General Contractor: IRICAV DUE
Prime Contractor: Salcef S.p.A.
Verona-Padua HS railway line - Verona-Vicenza Section - Track construction We have completed track construction along the entire Verona-Bivio Vicenza section, delivering 88 km of track and 20 turnouts in just six months.A major mile...
Clicca qui per richiedere la tua inserzione sponsorizzata.
Digitare
Contatta l'organizzazione
Sito Web
Indirizzo
Via Salaria, 1027
Rome
00138