JK Power Development department

JK Power Development department

Share

12/06/2026
13/05/2026

In view of the shutdown, all field employees are hereby directed to utilize the available time effectively and carry out the necessary pruning of tree branches along the power lines on priority basis. The pruning work shall be undertaken first on trunk lines and thereafter on tail-end sections so that faults can be minimized and the duration of interruptions during harsh weather conditions may be reduced to the maximum possible extent.

Want your business to be the top-listed Contractor in Srinagar?
Click here to claim your Sponsored Listing.

Category

Website

Address


Srinagar