KGC Engineering and Projects Private Limited
14/06/2024
KGC designed, manufactured and supplied 48 nos of Suction and Discharge Pulsation Dampeners for Compressor Package OEM Supplier, for 5 Nos Compressors to be installed at Numaligargh Refinery Expansion Project.
Equipment’s were designed for Wet H2S & Hydrogen service in accordance with ASME Sec VIII Div 1, with adherence to NACE MR 0103, Project & Process Licensor Specifications.
EPCM-ThyssenKrupp, Managing PMC-Technip Energies, Third Party Inspection-Det Norkse Veritas (DNV)
H2 Recycle Gas Compressor
Make Up Compressor
Regeneration Loop Compressor
Nitrogen Loop Compressor
SHU H2 Make Up Compressor
Air Compressor
10/06/2024
Design , Manufacture and Supply of Separator Vessel for Liquid Ring Vacuum Pressure Compressor Package for a Multinational OEM. The separator was designed and manufactured in accordance with ASME Sec VIII Div I and adhering to PMC and project specifications. The separator was for Wet H2s Service. Adhering to NACE MR0103 standard, all nozzles were restricted to Self Reinforced type (SRN) & Long Weld Neck (LWNRF). Ferrite content had restriction up to 7 Fn. Equipment’s was successfully delivered with desired quality standards.
End User- Numaligarh Refinery Limited, Assam, PMC- Thyssen Krupp India Third Party Inspection- Bureau Veritas
21/09/2022
On the shop floor. Enjoying what we do
30/01/2022
“ A satisfied customer is the best marketing strategy. “
Thank you S**C for this valuable testimonial. Congratulations to team KGC. Well done. !!
Click here to claim your Sponsored Listing.
Contact the business
Website
Address
Bhosari MIDC
Pune
411026