Bid Result for Development of Six-Lane Access Controlled Highway from *Gogwan Jalalpur to Ranipur Barsi of Shamli-Ambala* section of Bareilly-Ludhiana EC under BMP Phase-I in the State of Uttar Pradesh *(Package‐1)*.
Client: NHAI
Estimated Cost: 940.39
Length: 45.50
DoTS: 07.07.2022
DoTO: 08.07.2022
DoFO: 29.07.2022
1. Apco- 821
2. DBL- 1130
3. DRA - 864
4. GR Infra- 970.97
5. KRISHNA CONSTELLATION- 846
6. MG Contractors- 978.52
7. MCL- 864
8. PNC- 954
9. Raj Shyama- 819 *L1*
10. RCC Developers- 909