Integrated Engineering

Integrated Engineering

Share

18/03/2018

We can provide a high level of detailing (LOD)
Using the Revit and we can manage a whole BIM models and coordination in outstanding level.

LOD phases can be summarized as follows.

LOD 100: Modeled elements are at a conceptual point of development. Information can be conveyed with massing forms, written narratives, and 2D symbols.
LOD 200: Modeled elements have approximate relationships to quantities, size, location, and orientation. Some information may still be conveyed with written narratives.
LOD 300: Modeled elements are explained in terms of specific systems, quantities, size, shape, location, and orientation.
LOD 400: Continuation of LOD 300 with enough information added to facilitate fabrication, assembly, and installation.
LOD 500: Modeled elements are representative of as installed conditions and can be utilized for ongoing facilities management.

Want your business to be the top-listed Business in Cairo?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Sheraton Heliopolis, Masr El Tameer
Cairo
11799

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Sunday 9am - 5pm