Natural light creeping into this space on a winter afternoon. We are really loving the natural wood in this space. Paired with the warmth of brass and the contrast of black trim surrounding with class 🥂
Progress video on a new garage build in River Heights.
Enjoy this short video of all the drywall work coming together on this project.
The staircase needed to be dropped 2.5” to meet code for riser heights since we relocated the stair entrance. Original stairs took a corner and since there was a landing it was fine being a different height. However, the new stairs are all straight down.
Two new LVL beams went into this home to accommodate the wider opening into the kitchen and great room.
A lot of work that you would never anticipate by just looking at the drywall stage. The entire great room floor used to be rotted and completely out of level. We ripped it up and insulated it with spray foam and custom cut sleepers to bring it back to level.
That’s only a small fraction of the work that took place in the home to be at this stage.
A glimpse into the process of stripping a heavily painted stipple ceiling.
40 grit sandpaper was needed on the festool planex to make it smooth again.
Multiple days on the machine to remove the texture.
Two coats of mud to skim and the end result will be smooth and flat 💯
01/14/2021
Let’s just have a moment for this ✨
01/13/2021
Inside the shower you are completely surrounded by tile from head to toe featuring
Quartz floating bench
Shampoo niche
Quartz corner shelf for shaving
12” rain shower head with hand wand
Quartz curb with glass panel and glass entry door
And a single pot light on a dimmer
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Winnipeg, MB
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |