UltraSpan Technologies
06/03/2026
When timelines compress, speed becomes the strategy. πββοΈββ‘οΈ
Hollow core isnβt just faster. It fundamentally changes the pace of construction.
β’ Install 5,000β6,000+ sq ft per day on-site
β’ Place entire floors in days, not weeks
β’ Install at rates of 60β80 mΒ² per hour in active builds
β’ Complete structural phases in ~1 month vs 2.5+ months for cast-in-place
No formwork. No curing delays. No weather-driven setbacks.
What traditionally drags across months is compressed into a controlled, repeatable process.
Faster structure β faster enclosure β faster revenue. πΈ
04/21/2026
Hollow core is where engineering meets efficiency.
Prestressed hollow core slabs deliver long spans, high load capacity, and reduced structural weight through their signature void design. Less material, fewer supports, and more open, flexible spaces. π’
Because slabs are precast and installed quickly, projects move faster while maintaining consistent quality and performance.
Add in excellent fire resistance, acoustic performance, and thermal efficiency, hollow core becomes more than a structural element.
It becomes one of the most efficient and versatile systems in modern construction. π₯
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
165 Fennell Street
Winnipeg, MB
R3T0M6
Opening Hours
| Monday | 8am - 4:30pm |
| Tuesday | 8am - 4:30pm |
| Wednesday | 8am - 4:30pm |
| Thursday | 8am - 4:30pm |
| Friday | 8am - 4:30pm |