KP Construction Design-Build
10/28/2019
Living room renovation in a townhouse: fireplace, built-in side shelves, new hardwood floor, and painting work
10/05/2019
This a project we completed a while ago but haven't had a chance to post it: powder room reno as a part of an entire townhouse renovation. Other rooms are to follow.
Finishes used:
09/25/2019
This gorgeous master bathroom was recently completed by our team. The existing layout has been transformed into a modern space with high-end finishes. The main challenge was installation of the 500lbs free-standing ceramic bathtub that looks stunning in front of the floor to ceiling feature wall finished with large format tile slabs.
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
2-18 Cathedral High Street
Markham, ON
L6C0P2
Opening Hours
| Monday | 9am - 6pm |
| Tuesday | 9am - 6pm |
| Wednesday | 9am - 6pm |
| Thursday | 9am - 6pm |
| Friday | 9am - 6pm |
| Saturday | 9am - 3pm |