Roseke Engineering

Roseke Engineering

Share

Photos from Roseke Engineering's post 11/04/2024

This culvert was exhibiting severe deformations of up to 13% in places. It also had bank erosion problems with large voids forming above the downstream culvert end. Since it was long, and under a significant amount of fill (8 m), an open cut culvert replacement was a fairly expensive proposition for a road with 35 vehicles of traffic per day.

Normally, a culvert liner would be one of the best options in a scenario like this. But during our preliminary engineering we exhibited out-of-the-box thinking and recommended a highly innovative solution that involved vertical struts together with a concrete floor and fish baffles. This custom design saved the County about $300,000 versus a standard culvert liner, and about $1 million dollars versus a replacement.

Roseke Engineering always strives to provide the best value to our clients.

Want your business to be the top-listed Equipment Service in Lethbridge?
Click here to claim your Sponsored Listing.

Telephone

Address


3614/18 Avenue North
Lethbridge, AB
T1H5S7