At Tresah West in Victoria, the architectural balcony design presented us with a unique structural challenge and no standard precedent. The LBS structural engineering team worked in close collaboration with the architects to bridge the gap between complex drawings and physical reality, ensuring every detail was built to last.
This project is a perfect example of what happens when architectural ambition meets engineering creativity.
09/18/2025
๐ง๐ต๐ฒ ๐ง๐ผ๐๐ป๐ฒ ๐ฃ๐น๐ฎ๐ฐ๐ฒ ๐ฆ๐๐ถ๐๐ฒ๐ ๐ฏ๐ ๐ ๐ฎ๐ฟ๐ฟ๐ถ๐ผ๐๐ ๐ถ๐ป ๐ฆ๐ถ๐ฑ๐ป๐ฒ๐, ๐๐ ๐๐ฎ๐ ๐ณ๐ถ๐ฟ๐๐ ๐ฑ๐ฒ๐๐ถ๐ด๐ป๐ฒ๐ฑ ๐ถ๐ป ๐ฝ๐ฟ๐ฒ๐ฐ๐ฎ๐๐ ๐ฐ๐ผ๐ป๐ฐ๐ฟ๐ฒ๐๐ฒ.
But when budget concerns arose, the structure was redesigned using LBSโs lightweight steel stud system. The result? Lower costs, faster schedules, and no compromise on quality.
In just 11 weeks, a 3-storey, 129-unit hotel was erected.
This rapid schedule was achieved through extensive prefabrication, including the detailed parapet assemblies, which were pre-assembled in our shop and delivered to site for speedy er****on.
This required close collaboration between structural, architectural, and envelope teams, delivered through detailed planning and coordination.
At LBS, we are committed to finding solutions that bring our clientsโ ideas to life.
๐ For the full case study, click here: https://lwbsi.com/project/towne-place-suites-sydney/
๐๐ผ๐ ๐๐ผ ๐ฌ๐ผ๐ ๐๐๐ถ๐น๐ฑ ๐ง๐ต๐ฟ๐ฒ๐ฒ ๐ฅ๐ฒ๐๐ถ๐ฑ๐ฒ๐ป๐๐ถ๐ฎ๐น ๐๐๐ถ๐น๐ฑ๐ถ๐ป๐ด๐ ๐ฎ๐ ๐ข๐ป๐ฐ๐ฒ?
๐ ๐ ๐ฎ๐ฐ๐ธ๐ฒ๐ป๐๐ถ๐ฒ ๐ฉ๐ถ๐น๐น๐ฎ๐ด๐ฒ, ๐ฅ๐ฒ๐๐ฒ๐น๐๐๐ผ๐ธ๐ฒ, ๐๐
Constructing three residential buildings at the same time required an exceptional level of coordination across design, fabrication, delivery, and on-site installation.
With multiple trades working in parallel, maintaining alignment in scheduling, sequencing, and quality control was critical.
For example, equipment, workers, and materials had to be managed across all three sites simultaneously, while overall scheduling needed to account for shared resourcesโsuch as crane use and material deliveriesโto avoid delays and overlapping critical path work.
LBS supported this complexity by streamlining communication and leveraging our experienced 3D modelling process to keep all phases of construction aligned.
๐ง๐ต๐ฒ ๐ฟ๐ฒ๐๐๐น๐? A well-coordinated build that demonstrates how precision and planning bring multi-building projects like Mackenzie Village Phase 4 to life.
Mackenzie Village Case Study
https://lwbsi.com/project/mackenzie-village-4-revelstoke/
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
911 20 Street S. E
High River, AB
T1V2A6
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |