Solution Control Systems

Solution Control Systems

Share

Photos from Solution Control Systems's post 07/14/2026

⚑ MV Cables on Tech Tuesday βš‘πŸ”§
Did you know that most manufacturers of non-shielded medium-voltage (MV) cables recommend installing their cables on insulators or other non-conductive supports while maintaining proper phase-to-phase and phase-to-ground clearances?
However, when you visit substations, switchgear lineups, MCCs, and industrial facilities, you'll often see these same cables bundled together and supported directly on grounded metal structures.
So why is there such a difference between the manufacturer's recommendations and what is commonly seen in the field?
Is it driven by practical installation methods, equipment design constraints, industry experience, applicable standards, or something else?
πŸ’¬ Tech Tuesday Discussion:
What has been your experience with non-shielded MV cable installations?
Have you encountered issues such as partial discharge, corona, insulation degradation, or have these installations proven reliable in your applications?
We'd love to hear your thoughts and discuss the engineering considerations behind this common industry practice.
πŸ“© [email protected]
πŸ“ž 780-485-9944
🌐 www.solutioncontrols.ca
πŸ“© [email protected]
πŸ“ž 403-720-0277
🌐 www.controlinnovations.ca

07/03/2026

🟠 Friday Factory Floor | 5 kV Medium Voltage Junction Box

A custom built 5kV Junction Box finished in high-visibility international orange. This unit features removable gland plate, insulation and ground bus.

We build MV junction boxes with quick turnaround times and offer many options, including open-door or missing ground trip systems, voltage absence indicators, IR windows, and Posi-Pin connections that can be removed with a hot stick.

Whether your project requires low-voltage or medium-voltage power distribution, control, or protection systems, we deliver custom solutions built to meet your exact requirements.

πŸ“© Send your inquiries to [email protected]
πŸ“ž 780-485-9944 β€” book a free in-office or onsite consultation
🌐 www.solutioncontrols.ca

06/26/2026

βš™οΈ Friday Factory Floor | RTD Relay Panels

Precision temperature monitoring starts with reliable panel design.

These RTD Relay Panels are built with SEL RTD modules, marshalling terminals, and Type 4 enclosures for pump skid applications, delivering accurate, real-time temperature monitoring in demanding industrial environments.

Typical monitoring applications include:
βœ”οΈ Motor windings
βœ”οΈ Motor and pump bearings
βœ”οΈ Pump casing temperatures
βœ”οΈ Ambient conditions
βœ”οΈ Other critical process equipment

By providing real-time digital temperature data directly to your plant PLC or automation system, these panels help improve equipment reliability, enable predictive maintenance, and reduce unplanned downtime.

If you're looking for precise temperature measurement for critical equipment and real-time digital data integration with your plant PLC, we have you covered.

πŸ“© Send your inquiries to [email protected]
πŸ“ž 780-485-9944 β€” book a free in-office or onsite consultation
🌐 www.solutioncontrols.ca

Photos from Solution Control Systems's post 06/02/2026

πŸ”§βš‘ Transfer Switch Control Power – Tech Tuesday βš‘πŸ”§

When utility power is lost, an automatic transfer switch must continue to have control power available to detect the outage, initiate generator start-up, and complete the transfer sequence. A UPS is one common solution used to maintain uninterrupted control power during the transition from utility to generator power.

❓ Tech Tuesday Question:
What other methods can be used to provide uninterrupted control power for an automatic transfer switch during the transition period between utility and generator power?

Share your thoughts, experiences, and preferred solutions in the comments below. Let's see how many different approaches our industry has come up with.

πŸ‘‡ Join the discussion by leaving a comment!
Or
πŸ‘‡ Let’s hear your thoughts and field experience
πŸ“© [email protected]
πŸ“ž 780-485-9944
🌐 www.solutioncontrols.ca

Want your business to be the top-listed Engineering Company in Edmonton?
Click here to claim your Sponsored Listing.

Telephone

Address


15835 145 Avenue NW
Edmonton, AB
T6V0H8

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30pm
Friday 8am - 4:30pm