Electrical Tests Botswana - PTY - Ltd
27/02/2026
🔌 Energy Management Meter Installation Complete
We successfully installed a PowerLogic PM8000 by Schneider Electric
Installation Process:
Panel cut-out and meter mounting, CT and voltage wiring, communication setup, configuration, and commissioning.
Purpose:
Real-time monitoring of voltage, current, power, energy consumption, and power quality.
Importance in a Facility:
Improves efficiency, prevents overloads, enables early fault detection, and supports informed energy management decisions.
Smarter monitoring. Better performance. âš¡
14/01/2026
Transformer testing is essential to ensure that a transformer operates safely, efficiently, and reliably throughout its service life. These tests help identify faults such as insulation deterioration, shorted windings, and core abnormalities at an early stage, thereby reducing the risk of equipment failure, power outages, and costly repairs.
At Electrical Tests Botswana, we specialize in delivering thorough and accurate transformer testing solutions tailored to local industry requirements. Our advanced testing techniques, combined with an experienced technical team, allow for early detection of insulation degradation, winding defects, and internal faults before they escalate into major failures. By choosing Electrical Tests Botswana, clients benefit from reliable diagnostics, extended asset lifespan, reduced downtime, and assured safety and reliability of their electrical infrastructure.
Click here to claim your Sponsored Listing.
Contact the business
Telephone
Website
Address
Plot 154, Unit 1A, East Avenue St, Gaborone International Commerce Park, Gaborone
Gaborone
0000
Opening Hours
| Monday | 08:00 - 17:00 |
| Tuesday | 08:00 - 17:00 |
| Wednesday | 08:00 - 17:00 |
| Thursday | 08:00 - 17:00 |
| Friday | 08:00 - 17:00 |