Photos from mitchellmarineconstructions's post 14/02/2025

Cement Australia emergency works .
- 3 piles extracted extracted hooked up by divers
- 3 new 20m timber piles installed
- 7 timber pile checkouts
- 2 new headstocks installed

Photos 20/09/2024

Proud to be apart of this beauty ..
2 lane boat ramp , demo rebuild
5 lane boat ramp demo rebuild
190 meter concrete capping beam
Sheet pile box cofferdam
Thanks for a brilliant project ..

Photos from mitchellmarineconstructions's post 07/06/2022

Proud of this one..
- a gum tree fell on the gangways on the 1st Jan 2022, quoted to replace 2.
The flood came through in the end of Feb 2022.
Lost pontoon , gangways , piles and boat ..
Replaced the entire jetty , less than 3 months after the floods ..
first full replacement on the brisbane river since the Feb floods .
Awesome clients , thanks for trusting us 😊⚓️🤙🙏
We met the 50th birthday party deadline also 🎉
Thanks to pacfic pontoon for the fabrication on a quick turnaround..