Torres Design Studio
01/01/2023
Its been a while... fresh start!
Site preparation for installing fibre cement board ceiling next week - we are currently fixing additional steel membrane and suspension for the structural main frame work.
Full swing of construction works will start soon.
10/06/2020
050 Telecom Retail Shop
The Dubai Mall (Metro Link)
Project Completion: December 2017
Concept design + Technical drawings + Supervision
👉The retail outlet offers two types of sales - mobile phone accessories and repair services. To control the flow of consumer within the outlet, we provide a specific section for both operations.
👉Consumer who intends to shop any accessories can look into the modular wall display panels and can try a particular item. While those who needs to have a phone repair services can be attended over the service counter.
👉Most of the cases that we have encountered in doing the space planning, we always value the needs and wants of the business brand and its consumers.
👉Follow me for more tips, construction details and story behind our fit-out projects:
👉Instagram:
27/05/2020
Konafa Coffee Shop
Naeem Mall, RAK
Project completion: June 2016
Concept design + Technical drawings + Fit-out construction works
☝️This is the second branch we did for our client and which took us 45 days of fit-out construction period including customized furnitures.
☝️The project introduced a new concept as natural wooden element has been incorporated to the design in contrast with the primary color of the brand. These two key factors by simply combining textures (colors and natural wood) brings more comfort and warmth to the space and achieves a more relaxing place where you can just sit and drink a cup of cofee + konafa (one of the famous Arabic sweets).
Follow me for more tips, construction details hacks and story behind our fitout projects.
👉Instagram:
Click here to claim your Sponsored Listing.
Category
Address
Dubai