Maverick Carpentry

Maverick Carpentry

Share

Photos from Maverick Carpentry's post 05/20/2026

Kitchen Renovation- The pictures definitely tell the story, here's a little of what we did on this project, removed walls , replaced galvanized water lines with copper, insulated, installed LED lighting, fixed the height difference between rooms , vinyl plank flooring, installed 42" cabinets, quartz countertops, marble tiles, touch faucet, relocated the refrigerator, created a coffee bar w/floating shelves and a pantry. Finished the walls and ceilings w/Sherwin Williams paint.

Photos from Maverick Carpentry's post 04/24/2026

Removed the soaker tub that was inaccessible for the customer. Added a walk-in shower, extra grab bars , handheld shower head, vertical niche , turned the existing shower into a closet. Added in the wall heating, an updated exhaust fan ,LED lighting, reinstalled a stain glass window, viynl flooring . Customers are pleased !

03/26/2026

We installed this magnificent piece of artwork in their conference room . Great choice! Material is SEG with aluminum framing.

Want your business to be the top-listed Contractor in Steger?
Click here to claim your Sponsored Listing.

Category

Website

Address

Steger, IL

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm