Photos from Civil Solutions and Planning's post 03/16/2021

Installation of a 4000 ton submerged gravel wetland.

Photos from Civil Solutions and Planning's post 03/16/2021

Excavation and disposal of unsuitable materials- 15’ deep. This site is in Baltimore, previously demolished and rubble/steel was used to infill the original basement to grade.
We were contracted to remove, separate, and dispose of this material.
Afterwards, we place recycled material to new proposed buildings sub grade in controlled lifted. Achieving 99% or more compaction consistently.

Photos from Civil Solutions and Planning's post 03/16/2021

Excavation and I pavement of micro bio retention ponds.