Force/Collide
11/30/2024
Thrilled to say fabrication is complete for the permanent sculpture by ! 1,500 sq ft of this additive stainless lattice has been delivered and awaits installation at the KDM light rail station.
This is a huge milestone for our team, who modeled, designed, organized, cut, machined, and fit over 9,000 parts and finished tens of thousands of welds. Very proud to be part of this project with an incredible artist and Sound Transit Art Program.
Artist: Michelle De La Vega
Fabricator: Force/Collide
START Project Manager: Ashley Long
Engineer: Nick Geurts
03/27/2024
We recently fabricated two conference tables in blackened steel and white oak for Certa Building Solutions. Love the details in this design.
Design: Certa Building Solutions
Finish: Mistur Metals and Patinaworks
Woodwork: Thaddeus Dallas
Click here to claim your Sponsored Listing.
Category
Contact the public figure
Telephone
Website
Address
Seattle, WA