FoQus Development
06/04/2026
⚠️ Disclaimer: The conditions shown in these photos were not the work of FoQus Development. These images document issues we discovered during project evaluations and repairs. Since these photos were taken, the deficiencies have been properly corrected and brought up to professional standards by our team.
What you don't see behind the finished project is often what matters most.
Construction is more than building—it's about protecting your investment for years to come.
From properly locating and installing septic systems, to ensuring access for future maintenance, every detail matters. Waterproofing window and door openings isn't just a best practice—it's critical for preventing water intrusion, mold growth, and costly structural damage. Specialty features like decorative fountains require experienced craftsmanship to ensure they perform as beautifully as they look.
These examples highlight why it is so important to carefully vet contractors, verify licensing and insurance, review past work, and understand payment schedules before starting a project. Quality construction requires experience, planning, accountability, and attention to detail.
At FoQus Development, our goal is simple: build it right, communicate clearly, and help bring our clients' vision to life with craftsmanship they can trust. Whether we're starting from the ground up or correcting existing deficiencies, we're committed to delivering results that perform as well as they look.
05/25/2026
As we enjoy time with family and friends this Memorial Day, we remember the heroes who made it possible.
Thank you for your service and sacrifice. 🇺🇲
05/20/2026
From the ground up - literally. 🔨
What started as horizontal foundation work is now transforming into vertical construction, marking a major milestone in the build process. From the slab foundation to framing, roofing, and the formation of the building envelope, this project is taking shape fast.
Next up:
⚡ Electrical panel installation
💡 Electrical + lighting rough-ins
📡 Low-voltage rough-ins
🚪 Garage door prep
Follow along as we move into exterior grading, stucco installation, garage doors, and the portal breezeway connection to the main house.
05/05/2026
Here’s to culture, connection, and community.
¡Feliz Cinco de Mayo! 🇲🇽
04/29/2026
Moving onto phase two of our VA project! 🚧
This project started with a critical mission: open up and reline the existing underground piping system beneath the hospital after years of corrosion caused by heavy chemical use. With the relining now complete, the team is moving into the next major phase — backfilling eight individual 10-foot-deep access holes and preparing the space for what comes next.
The end goal is bigger than pipe repairs. We’re helping create a new and improved SPS work environment with a better floor plan, upgraded equipment, and higher-quality finishes — all designed to make daily operations smoother, safer, and more efficient for the hospital staff.
It’s not always the work people see, but it’s the work that keeps a hospital moving. 🏥
04/20/2026
Swipe to see how this full home interior remodel transformed every corner—featuring 3 bedrooms, 3 bathrooms, a completely reimagined kitchen, and all-new flooring, lighting, drywall, paint, stair rail, and roofing.
We also elevated the home’s performance with upgraded electrical and a high-efficiency HVAC system, delivering lasting comfort, reliability, and long-term value. 🔨
04/13/2026
We are so proud to bring this ground-up garage and pergola addition to life, thoughtfully designed to complement the home’s classic territorial style.
From initial architectural plans and permit expediting to installing a durable ICF foundation system, this project is built on a strong foundation—literally. We’ve also incorporated the latest technology with an Infiltrator EZflow drain field to meet New Mexico’s updated liquid waste codes.
We’re just getting started—follow along as vertical construction begins and this project takes shape. 🏠
04/05/2026
Happy Easter from our family to yours!
We’re grateful to be part of a community that continues to support local, family-owned businesses like ours. It means a lot to do the work we love alongside people we value.
Wishing you a great day with family, friends, and a little time to enjoy the season. 🐣
03/24/2026
From garage to creative haven ✨
What started as a basic two car garage, complete with exposed plumbing and mechanical systems, has been fully reimagined into a clean, modern artist’s studio. By rerouting key elements, we opened up the space to create a comfortable environment built for long days of inspiration.
Feeling a little extra lucky as we head into Saint Patrick’s Day 🍀
Phase 1 of our VA project is officially complete! This video highlights the finished construction of the temporary facility for the Sterile Processing Unit, an important step that allows operations to continue while work progresses.
Proud of the team for the hard work and momentum—now we’re moving into Phase 2: the renovation of the existing Sterile Processing Unit. 🚧
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
Santa Fe, NM
87505
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |