NPM Construction Co.
05/22/2026
NPM Construction Co. is contracting with City of Redmond for NE 70th Street Crosswalk.
The project includes construction of a new crosswalk across the north leg of the Redmond Way and NE 70th Street intersection, including the reconstruction of sidewalks, curb ramps, and pavements; paving a new traffic island in the intersection; modifications to a traffic signal system; illumination system, including poles, foundations, conduits, junction boxes, and wiring; and traffic control and detour routing and other necessary work to complete the project.
Estimated construction start: June/July 2026
05/15/2026
NPM Construction Co. is contracting with the City of Issaquah for its 2026 Concrete Maintenance Program. The program provides for the improvement of ADA pedestrian curb ramps, curb and gutter, vertical curb and sidewalk. Additionally, this work includes asphalt patching (temporary and permanent), base preparation and utility adjustments.
The Concrete Maintenance Program will spread to six areas throughout the City. The areas include Aspen Meadows 2, Issaquah-Pine Lake Rd SE & SE Issaquah Fall City Rd, Newport 3 along Newport Way SW, South Lake Sammamish 4 off 188th Ave SE, 187th Pl SE and 192 Ave SE.
NPM Construction Co. contracted with Snohomish County PUD for sidewalk improvements and tree removal in Everett WA. Work will start in early December. Scope of work includes removing sections of lifting sidewalk sections cause by roots and removal of trees and stumps at these locations and replacing concrete sidewalk including ADA handicap ramps.
Click here to claim your Sponsored Listing.
Contact the organization
Telephone
Website
Address
Maple Valley, WA
98038