Kinslee Design & Installation
03/13/2026
The shower came out real nice. In the before pics, that left side was there shower. Now their shower is where the tub was, a foot longer at 6' long instead of 5 and 4 inches wider than before!
4 shelves, floating bench and a pebble tile hidden linear drain. Awesome color contrast with the subway and dark gray.
With demo and plumbing and glass!! this remodel will be close to 11k ! Please contact me for your project.
Tile is a luxury but it doesnt have to cost a fortune ... like the glass guy (jk!!)
03/04/2026
Day 4 ! 95% prep is done. Because a couple of the days were short this project is right on schedule.
Bench will go in the next couple days, then its ready for tile :).
Shower will feature a floating bench, linear hidden drain and 4 shelves.
02/27/2026
Day 1! Out with the old . :)
02/23/2026
Another green subway beauty complete. What a great deal for this tub surround, tub floor and a large brick floor with a herringbone inlay for a little over 5k.
Give me a call if you have any tile work you had in mind:)
02/11/2026
Floor came out mint :). This is a herringbone inlay with small brick tile. The white grout makes it look awesome, a blend between rustic and modern.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
59715
Opening Hours
| Monday | 7am - 7pm |
| Tuesday | 7am - 7pm |
| Wednesday | 7am - 7pm |
| Thursday | 7am - 7pm |
| Friday | 7am - 7pm |
| Saturday | 10am - 2pm |
| Sunday | 12am - 5pm |