American Antimony Corp.
05/05/2026
Did you see our latest news?
XTPT just delivered a high-resolution Photogrammetry–LiDAR model of the Antimony King Mine — bringing the entire underground system into a fully visualized 3D environment.
📍 ~295 ft of mapped underground workings
📍 Identified structural continuity + mineralized zones
📍 Direct advancement toward mine planning
Watch the full walkthrough + read the PR:
🔗 https://www.newsfilecorp.com/release/295706/American-Antimony-Delivers-HighResolution-PhotogrammetryLiDAR-Model-of-Antimony-King-Mine-with-Video-Walkthrough-Advancing-Toward-Mine-Planning-and-Development
04/13/2026
American Antimony Deploys Western Frontier Exploration & Mining to Advance Structural Mapping, 3D Modeling, and Small Mine Planning at Antimony King : OTCID - XTPT
🔗 https://www.newsfilecorp.com/release/292133/American-Antimony-Deploys-Western-Frontier-to-Advance-Structural-Mapping-3D-Modeling-and-Small-Mine-Planning-at-Antimony-King
CEO Commentary
"This phase of work represents a meaningful step forward as we transition from technical validation into operational planning," said Mac J. Shahsavar, P.Eng., Chairman and Chief Executive Officer of American Antimony Corporation.
"We are now integrating surface mapping, underground access, and drone data into a cohesive 3D model of the Antimony King system. This is exactly the type of work required to move a project toward real mining scenarios. Combined with our previously reported metallurgical results, we are building a clear pathway toward disciplined, staged development."
04/02/2026
Did You See Our News?
🔗https://money.tmx.com/en/quote/XTPT:US/news/8810893516098640/American_Antimony_Initiates_Small_Mine_Permit_Process_at_Antimony_King_Mine_in_Support_of_US_Supply
American Corp. has initiated the Small Mine Permit process at the Antimony King Mine, marking an important step toward advancing the project.
This phase is designed to support:
▪️Surface material access and bulk handling
▪️Ongoing metallurgical optimization
▪️Preparation for near-term production activities
▪️Development of a scalable operational footprint
The permit process represents a key transition point as the Company moves from:
👉 Validation → Early-Stage Production Planning
Why This Matters ⤵️
The Antimony King Mine hosts:
▪️Previously identified high-grade surface material
▪️Proximity to existing infrastructure
▪️Alignment with the Company’s phased development strategy
Advancing permitting enables the Company to begin:
▪️Structured material movement
▪️Expanded sampling and processing
▪️Operational planning at scale
This milestone builds on recent progress, including:
▪️Successful metallurgical testing (97% recovery)
▪️High-grade head grade confirmation (30.3% Sb)
▪️Drill validation at the Arrance Mine
Initiating the Small Mine Permit process is a foundational step toward transitioning the project from validation into operational development.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
10900 Research Boulevard
Austin, TX
78759
Opening Hours
| Monday | 9am - 4pm |
| Tuesday | 9am - 4pm |
| Wednesday | 9am - 4pm |
| Thursday | 9am - 4pm |
| Friday | 9am - 4pm |