Universal Dry Ice Blasting
Varnish Applied to a 1913 Hydroelectric Generator after Dry Ice Blasting Completes another Amazing Project that we are Grateful to be Part of - All of this Work was Completed with the Rotor in Place
We are cleaning Stator Air-Cooling Ventilation Channels with the Rotor in Place on a 1913 Hydroelectric Generator. This is a view from the inspection window.
Clogged ventilation channels are the leading cause of overheating. The rule of thumb is for every 10°C over recommended running temperature will reduce winding life by 50%.
Dry Ice Blasting a 98MW Hydroelectric Generator - Universal Dry Ice Blasting
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
92307