Sherazi
Mr. Sun Taijun, from China, is overseeing the ongoing high-power (Hi-Pot) testing of the transformer cable boxes, ensuring that all insulation integrity and safety standards are thoroughly met during the process
This video shows the installation and connection process of a cable box with the main tank transformer. The work includes proper alignment, secure cable termination, and safety compliance to ensure reliable electrical performance. All connections are carried out according to standard installation procedures to maintain system efficiency and operational safety.