Avalon Slipform

Avalon Slipform

Share

Photos from Avalon Slipform's post 07/03/2026

We are proud to have successfully completed the heavy lifting of three elevated water tanks (600 m³ capacity each)
in Hail, Saudi Arabia 🇸🇦.

Each tank was prepared and lifted within 10 days,
reflecting strong planning, engineering coordination, and safe ex*****on of complex heavy lifting operations.

16/07/2022
Want your business to be the top-listed Engineering Company in Jeddah?
Click here to claim your Sponsored Listing.

Website

Address

Jeddah