ArawTech

ArawTech

Share

29/05/2026

Kasama po sa package namin ang sign and seal ng forms para sa net metering ⚡️🔋☀️ dm lang

28/05/2026

Di lang po pangpababa ng bill ang solar power.

Para po ito sa mga kababayan nating di pwedeng mawalan ng power, di nag woworry sa power outages, no fear sa utility price hikes.

Dm us

25/05/2026

Dont wait til this happens. We provide plans, sign and seal docs on all of our packages, DM US

The DTI's Bureau of Philippine Standards is finalizing a new regulation that requires all residential and commercial solar panel systems to secure official government certification.

The mandate covers solar panels, inverters, battery storage units, charge controllers, and photovoltaic cables.

Under the new guidelines, all solar equipment must display an official PS or ICC safety mark to legally enter and be sold in the Philippine market.

23/05/2026

Zero bill ni client‼️

Ito ang result pag tama ang computation☀️
✅Unli aircon
✅Unli cook sa induction
✅Unli charge sa EV car

No more kaba pag dating ng bill‼️

Dm us☀️

23/05/2026

We provide actual solutions for your solar power needs ! Dm us

22/05/2026
21/05/2026

Rotating brown outs happening, dapat handa ka, di mo kailangan malaking setup agad pero at least may backup ka dapat

19/05/2026

Don’t wait until its too late! message us free estimate☀️

Filipinos should brace for more rotational blackouts this year as yellow and red alerts are likely to persist in the coming months amid the looming threat of El Niño, according to the Department of Energy (DOE). https://tinyurl.com/3hda5czc | via ONE News

Photos from ArawTech's post 18/05/2026

Completed installation at Canlubang, Laguna ☀️
Another quality solar setup by ArawTech 🔋⚡

✔ 6kW Hybrid Inverter
✔ 16kWh Battery Backup
✔ Clean and professional installation
✔ Ready for daily savings and brownout backup

Thank you for trusting ArawTech Solar Power Services 🙏

Planning to install solar for your home or business?
Message us today for a FREE site visit and quotation.☀️

17/05/2026

Sunday solar system install sa Calamba Landmark Subdivision 6kw 314ah 10 620kw panel lets go! Dm us

15/05/2026

Good morning mga boss!

Want your business to be the top-listed Engineering Company in Lipa City?
Click here to claim your Sponsored Listing.

Website

Address

Lipa City
4217