SlabDecor
10/06/2026
Laying of margelles in progress around the pool area with careful alignment and spacing to ensure a clean and elegant finish.
Preparation of the surface has been completed to provide a strong and durable base before installation. Each margelle is being placed with precision to guarantee stability, safety, and long-lasting quality while enhancing the overall appearance of the swimming pool area.
02/06/2026
Land leveling in progress 🚧
Work is currently being carried out to prepare and level the surface for upcoming slab installation works.