Ring main 01 PHASE 02(OHTL 11 KV)
في شمال الرميلة،
Our company has completed works of the first stage of the Overhead transmission line Ring main 01& 02 PHASE 02(OHTL) Project in North Rumaila, the activities have been done as:
Site surveys (route, geographical, and topological).
• All design works (including design of poles and foundations).
• Preparation of right of way.
• Procurement of all materials (overhead conductors, steel towers, insulators, fiber optic cable (OPGW), and any other materials required for completion of the OHTL works).
• All OHTL installation works including Tower foundations.
• Design, supply, and installation of the foundations for the free-issued Ring-main Connection skid (RMU, transformer, and harmonic filter) located at the well site.
• Installation of the free-issued skid at each ESP well site.
• Electrical connections of the free-issued Ring-main Connection skid with the OHTL.
• Cabling to the VSD (Variable Speed Drive) skid.
• OPGW (Optical Ground Wire) Supply, Installation, and Terminations.
• Commissioning & Testing