Your robot cell is underused.
The cell looks busy because the robot is moving. But "moving" isn't "producing." 38% productive cycle. 24% idle waiting upstream. 12% blocked downstream. 15% changeover. 11% starved of material. Six hours in every ten are something other than value-add.
A robot at 38% utilization is 62% of a second robot you didn't have to buy. The capacity is already paid for — it just isn't being scheduled.
We instrument one cell, build the timecard, find the dominant idle cause — in 2 weeks. Typical reclaim: +28% throughput without buying a robot.
Comment MEASURE to start.
11/06/2026
Batch reporting is dead.
A PDF at end-of-shift is an autopsy. Operators read it tomorrow. The line keeps making the same mistake until someone opens the attachment.
Streaming dashboards push the data the moment it's read. Operator sees the drift, acts on it, fixes it — before the loss ships. 24 hours → 30 seconds.
We pick one batch report, stand up the MQTT broker, build the live dashboard — in 3 weeks.
Comment STREAM to start.
30/05/2026
Energy monitoring pays for itself.
Most plants leak 15% of consumption to idle equipment — quietly, every shift. Idle motors. Standby loads. Mis-set setpoints. Together they sit at ~30% of baseline waste before anyone changes a single process.
The fix is unglamorous: one smart meter per motor over 5 HP. Two weeks of baseline data. The worst ten contain 80% of the waste. Average payback across our rollouts: 9 months.
We audit your motor fleet and hand back the first leak report in 90 days.