OM Property Design
17/11/2020
1 Bed Apartment Re-Paint.
Quick in and out. Clients were looking to rent out the property so needed it cleaned up so we filled where needed and painted only hold up was a large bit of mould behind a cupboard unit which we sealed up and painted.
Walls done in magnolia.
17/11/2020
Bathroom renovation.
This bathroom was in a bad way we stripped out the hole bathroom back to bare and started from scratch. We put D.P.M on the walls where the damp seemed to be prevalent and from there we boxed in the services to keep it looking neat and proceeded to tile the bathroom.
Other things installed in the bathroom include:
Towel radiator
Free standing bath
Sink & unit
Toilet & system
Shower system
Click here to claim your Sponsored Listing.