Three Brothers

Three Brothers

Share

17/08/2019

Transformer site tests

1. Visual inspection.
2. Insulation resistance test.
3. Tan Delta test (Dielectric loss test).
4. First operation of on load tap changer (OLTC)
5. Turns ratio test.
6. Vector group verification.
7. no – load current test.
8. Winding resistance test.
9. Function test & Scheme check.

Photos from Three Brothers's post 15/02/2018

Voltage drop

Photos from Three Brothers's post 14/02/2018

تصميم اعمال القوى
# الكود المصرى

Photos from Three Brothers's post 12/02/2018

Road Lighting in simple form

Want your university to be the top-listed University in Cairo?
Click here to claim your Sponsored Listing.

Telephone

Address

Cairo