Transformer site tests
1. Visual inspection.
2. Insulation resistance test.
3. Tan Delta test (Dielectric loss test).
4. First operation of on load tap changer (OLTC)
5. Turns ratio test.
6. Vector group verification.
7. no – load current test.
8. Winding resistance test.
9. Function test & Scheme check.