Carpi Tech

Carpi Tech

Teilen

Photos from Carpi Tech's post 31/05/2016

Canton Weir, located in Canton, Oklahoma, was successfully completed at the end of last week. Carpi added an external waterstop in ten locations

Photos 11/03/2016

Hume Lake Dam, California, USA - finished !!!

Photos 24/02/2016

Last roll of membrane installed at Hume Lake Dam today... But as you can see we are not finished yet ;-)

Photos from Carpi Tech's post 11/01/2016

2016 marks 20 years since the completion of Bouillouse 1. Bouillouse 1 is a gravity/masonry dam and the geomembrane system is still performing after being installed in 1996.

Photos 07/01/2016

Snow Man on the watch for trespassers... :-D

Photos from Carpi Tech's post 04/01/2016

Great progress at Hume

Photos 23/12/2015

It's been about a month, since we finished lining of Camporredondo dam - over 60m tall masonry dam in Spain. Our crew had to face some harsh weather conditions there, including floods that few times during installation drowned the lowest compartment area around the intake structure...

Photos 12/12/2015

...not too shabby, ha? ;-)

Photos from Carpi Tech's post 11/12/2015

Hume Lake Dam, located in Sequoia National Park, California
Carpi USA crew is making great progress on the multiple arch dam

Photos 20/10/2015

Carpi Tech will be 2015 Conference, in Brisbane, Australia, 4-8 November 2015. Stand N. 8.

13/10/2015

Carpi Tech will be @ Hydro 2015 Conference and Exhibition, in Bordeaux, France, 26-28 October 2015. Stand 57.

Wollen Sie Ihr Service zum Top-Reiseagentur in Balerna machen?
Klicken Sie hier, um Ihren Gesponserten Eintrag zu erhalten.

Adresse


Via Passeggiata 1
Balerna
6828