1 Day Racking Installation in Cobourg, ON šØš¦š·āāļøšØ
On our way back into town from a bigger project we stopped by in Cobourg and completed this small install in half a day.
It was a smooth and clean install. We were literally in and out.
08/06/2024
High Bay Racking Installation in Frankford, ON šØš¦š·āāļøšØ
An installation we completed for our friends at PAC RAC Systems. This was phase 1, which we completed in a little over a week. Iām the following year their in-house team went to complete phase 2.
08/06/2024
Racking & Cantilever Relocation in Brampton, ON (Phase 2)
For phase 2 we completed a bigger relocation of 18 racking bays and 12 cantilevers. This time we relocated these systems into a new warehouse, which the client would use for storage outside their manufacturing facility