Maruf Hasan
đš 1. āϏā§āĻĒā§āϏāĻŋāĻĢāĻŋāĻā§āĻļāύ āĻāĻŋ?
āĻāϤā§āϤāϰ: āĻāĻžāĻāĻāĻŋ āĻāĻŋāĻāĻžāĻŦā§ āĻ āĻā§āύ āĻ
āύā§āĻĒāĻžāϤ⧠āϏāĻŽā§āĻĒāύā§āύ āĻšāĻŦā§ āϤāĻžāϰ āĻŦāĻŋāϏā§āϤāĻžāϰāĻŋāϤ āύāĻŋāϰā§āĻĻā§āĻļāύāĻžāĻā§ Specification āĻŦāϞā§āĨ¤
đš 2. āϏāĻŋāĻĄāĻŋāĻāϞ āĻāĻŋ?
āĻāϤā§āϤāϰ: āϝ⧠āύāĻŋāϰā§āĻĻā§āĻļāĻŋāĻāĻžāϝāĻŧ Specification, BOQ āĻāĻŦāĻ RateāϏāĻš āĻŦāĻŋāϏā§āϤāĻžāϰāĻŋāϤ āϞā§āĻāĻž āĻĨāĻžāĻā§, āϤāĻžāĻā§ āϏāĻŋāĻĄāĻŋāĻāϞ āĻŦāϞāĻž āĻšāϝāĻŧāĨ¤
đš 3. Project Launch āĻāϰāϤ⧠āĻā§ āĻā§ āĻĻāϰāĻāĻžāϰ?
āĻāϤā§āϤāϰ: āĻāĻžā§āĻāĻž, āĻĄā§āϰāĻāĻ, āĻĄāĻŋāĻāĻžāĻāύ, āϏāĻŋāĻĻā§āϧāĻžāύā§āϤ, āĻĒā§āϰā§ā§āĻāύā§ā§ āϞā§āĻāĻŦāϞ āĻāĻŦāĻ āĻāĻĒāĻāϰāĻŖāĨ¤
đš 4. Layout āĻāĻŋ?
āĻāϤā§āϤāϰ: āĻĄā§āϰāĻāĻ āϏāĻŋāĻā§ āĻĨāĻžāĻāĻž āĻĄāĻŋāĻāĻžāĻāύ āĻ
āύā§āϝāĻžāϝāĻŧā§ āĻĢāĻŋāϞā§āĻĄā§ āĻŽāĻžāĻĒ āĻ
āύā§āϝāĻžāϝāĻŧā§ āϏā§āĻĨāĻžāĻĒāύ āĻŦāĻž āϏā§āĻ āĻāϰāĻž-āĻā§ Layout āĻŦāϞā§āĨ¤ Layout āĻāϰāĻžāϰ āϏāĻŽā§ āĻĒā§āϰāĻĨāĻŽā§ āϏā§āĻāĻž āĻāϝāĻŧāĻžāϞ āĻĨā§āĻā§ āĻļā§āϰ⧠āĻāϰāϤ⧠āĻšāĻŦā§āĨ¤
đš 5. Grid Line āĻāĻžāĻā§ āĻŦāϞā§?
āĻāϤā§āϤāϰ: āĻāĻžāĻā§āϰ āϏā§āĻŦāĻŋāϧāĻžāϰ āĻāύā§āϝ āĻĄā§āϰāĻāĻ-āĻ āύāĻŋāϰā§āĻĻāĻŋāώā§āĻ āĻĻā§āϰāϤā§āĻŦā§ āĻāϤā§āϤāϰā§āϰ āĻĻāĻŋāĻā§âāĻĻāĻā§āώāĻŋāĻŖ āĻāĻŦāĻ āĻĒā§āϰā§āĻŦ-āĻĒāĻļā§āĻāĻŋāĻŽā§ āĻāĻžāύāĻž āϰā§āĻāĻžāĻā§ Grid Line āĻŦāϞā§āĨ¤ āĻāĻāĻŋ āĻšāϞ Reference Line, āĻāĻāύ⧠Center Line āύāϝāĻŧāĨ¤
đš 6. Centre Line āĻāĻžāĻā§ āĻŦāϞā§?
āĻāϤā§āϤāϰ: āĻāϞāĻžāĻŽ āĻŦāĻž āĻĢā§āĻāĻŋāĻ-āĻāϰ āĻŽāϧā§āϝ āĻŦāϰāĻžāĻŦāϰ āĻāĻžāύāĻž āϰā§āĻāĻžāĻā§ Center Line āĻŦāϞā§āĨ¤ āĻāĻāĻŋ member-āĻāϰ āϏā§āύā§āĻāĻžāϰā§āϰ āĻŽāϧā§āϝ āĻĻāĻŋāϝāĻŧā§ āϝā§āϤ⧠āĻšāĻŦā§āĨ¤ Center Line Grid Line āĻšāĻŋāϏā§āĻŦā§ āϧāϰāĻž āϝā§āϤ⧠āĻĒāĻžāϰā§āĨ¤
đš 7. āĻāĻāĻāĻŋ āĻāϞāĻžāĻŽ āĻ āĻĢā§āĻāĻŋāĻ-āĻāϰ āĻ
āĻŦāϏā§āĻĨāĻžāύ āĻāĻŋāĻāĻžāĻŦā§ āύāĻŋāϰā§āϧāĻžāϰāĻŖ āĻāϰāĻž āĻšāϝāĻŧ?
āĻāϤā§āϤāϰ: āĻāϞāĻžāĻŽā§āϰ Center Line āĻāĻŦāĻ āĻĢā§āĻāĻŋāĻ-āĻāϰ Center Line āĻ
āĻŦāĻļā§āϝāĻ āĻāĻāĻ āĻŦāĻŋāύā§āĻĻā§āϤ⧠āĻĨāĻžāĻāϤ⧠āĻšāĻŦā§āĨ¤ āĻŦāĻŋāĻļā§āώ āĻāĻžāϰāĻŖ āĻāĻžā§āĻž āĻāĻāĻŋāϰ āĻŦā§āϝāϤāĻŋāĻā§āϰāĻŽ āύā§āĻāĨ¤
đš 8. Layout āĻāϰāĻžāϰ āϏāĻŽāϝāĻŧ āĻŽāĻžāĻāĻŋ āĻĒāϰā§āĻā§āώāĻž āĻāĻŋāĻāĻžāĻŦā§ āĻāϰāĻž āϝāĻžāϝāĻŧ?
āĻāϤā§āϤāϰ: āϏā§āϤāĻžāϰ āϏāĻžāĻšāĻžāϝā§āĻ¯ā§ ā§Š-ā§Ē-ā§Ģ āĻĢā§āĻā§āϰ āϏāĻŽāĻā§āĻŖā§ āϤā§āϰāĻŋāĻā§āĻ āϤā§āϰāĻŋ āĻāϰā§āύāĨ¤ āĻāĻāĻŋ āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻāϰ⧠āϝā§āĻā§āύ⧠āĻāϰā§āύāĻžāϰ⧠⧝ā§Ļ° āĻā§āĻ āĻāϰāĻž āϝāĻžāϝāĻŧāĨ¤
đš 9. Pile Layout āĻāĻŋāĻāĻžāĻŦā§ āĻāϰāϤ⧠āĻšāĻŦā§?
āĻāϤā§āϤāϰ: Building Layout āĻĢāĻžāĻāύāĻžāϞ āĻāϰāĻžāϰ āĻĒāϰ Drawing āĻ
āύā§āϝāĻžāϝāĻŧā§ Pile Point āύāĻŋāϰā§āϧāĻžāϰāĻŖ āĻāϰā§āύāĨ¤ āĻĒā§āϰāϤāĻŋāĻāĻŋ āĻĒāϝāĻŧā§āύā§āĻā§ ā§Ž/ā§§ā§Ļ āĻŽāĻŋāĻŽāĻŋ āϰāĻĄ āĻāĻāĻĢā§āĻ āĻĒā§āĻāϤā§, āϏāĻžāĻŽāĻžāύā§āϝ āĻĸāĻžāϞāĻžāĻ āĻāϰ⧠Pile Point āĻ āĻŋāĻ āϰāĻžāĻāϤ⧠āĻšāĻŦā§āĨ¤
đš 10. āĻĒāĻžāĻāϞ āĻāϤ āĻĒā§āϰāĻāĻžāϰ?
āĻāϤā§āϤāϰ: āĻāĻžāϰā§āϝāĻĒā§āϰāĻŖāĻžāϞā§āϰ āĻāĻĒāϰ āĻāĻŋāϤā§āϤāĻŋ āĻāϰ⧠āĻĒāĻžāĻāϞāĻā§ āĻāĻžāĻ āĻāϰāĻž āϝāĻžāϝāĻŧ:
Function āĻ
āύā§āϝāĻžāϝāĻŧā§
Driving āĻ
āύā§āϝāĻžāϝāĻŧā§
Classification āĻ
āύā§āϝāĻžāϝāĻŧā§
āĻāĻāĻžā§āĻž āĻĒā§āϰāĻā§āϤāĻŋ āĻ
āύā§āϝāĻžāϝāĻŧā§:
Pre-Cast Pile
Cast-in-Situ Pile
đš 11. 18" āĻĄāĻžāϝāĻŧāĻž Pile-āĻāϰ āĻāύā§āϝ āĻāϤ āĻāĻŋāĻā§āϞ āĻŦā§āϝāĻŦāĻšāĻžāϰ?
āĻāϤā§āϤāϰ: 16" āĻĄāĻžāϝāĻŧāĻž āĻāĻŋāĻā§āϞ āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻāϰāϤ⧠āĻšāĻŦā§āĨ¤
đš 12. āϝ⧠āĻĒāĻžāĻāĻĒ āĻĻāĻŋāϝāĻŧā§ Pile āĻĸāĻžāϞāĻžāĻ āĻšāϝāĻŧ, āϤāĻžāϰ āύāĻžāĻŽ āĻāĻŋ?
āĻāϤā§āϤāϰ: āϤā§āϰāĻŋāĻŽāĻŋ āĻĒāĻžāĻāĻĒāĨ¤
đš 13. āϤā§āϰāĻŋāĻŽāĻŋ āĻĒāĻžāĻāĻĒā§āϰ āĻĄāĻžāϝāĻŧāĻž āĻāϤ?
āĻāϤā§āϤāϰ: 6" āĻĨā§āĻā§ 7" āĻĒāϰā§āϝāύā§āϤāĨ¤
đš 14. āĻŦā§āϰāĻŋāĻ āĻāϝāĻŧāĻžāĻļ āĻāϤ āϏāĻŽāϝāĻŧ āĻāϰāϤ⧠āĻšāĻŦā§?
āĻāϤā§āϤāϰ: āĻāĻŽāĻĒāĻā§āώ⧠āĻ
āϰā§āϧ āĻāĻŖā§āĻāĻž, āĻ
āϰā§āĻĨāĻžā§ āϝāϤāĻā§āώāĻŖ āĻĒāĻžāύāĻŋ āĻāĻžāĻĻāĻž āĻāϏā§āĨ¤
đš 15. Pile-āĻ Aggregate āĻā§ āĻāĻŦāĻ āĻ
āύā§āĻĒāĻžāϤ āĻāϤ?
āĻāϤā§āϤāϰ: Aggregate āĻšāĻŋāϏā§āĻŦā§ Stone Chips/ Singles āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻšāϝāĻŧāĨ¤ āĻ
āύā§āĻĒāĻžāϤ āϏāĻžāϧāĻžāϰāĻŖāϤ 1:8:1.83āĨ¤
đš 16. Cut-Off Level āĻāĻŽ āϰā§āϏāĻŋāĻāϤ⧠āĻā§āύ āĻāĻžāϏā§āĻāĻŋāĻ āĻāϰāĻž āĻšāϝāĻŧ?
āĻāϤā§āϤāϰ: āĻāĻžāϏā§āĻāĻŋāĻ-āĻāϰ āĻĒāϰ Cut-Off Level āĻāĻžāĻāϤ⧠āĻšāϝāĻŧ, āϤāĻžāĻ āĻāĻŽ āϰā§āϏāĻŋāĻāϤ⧠(1:2:4 āĻŦāĻž 1:3:6) āĻāĻžāϏā§āĻāĻŋāĻ āĻāϰāĻž āĻšāϝāĻŧāĨ¤
đš 17. āĻāĻāĻāĻŋ Pile āĻŦā§āϰāĻŋāĻ-āĻāϰ āĻĒāϰ āĻĒāϰāĻŦāϰā§āϤ⧠Pile-āĻāϰ āĻĻā§āϰāϤā§āĻŦ āĻāϤ?
āĻāϤā§āϤāϰ: āĻāĻŽāĻĒāĻā§āώ⧠6 āĻĢā§āĻ, āĻŦā§āĻļāĻŋ āĻšāϞ⧠āĻāϰāĻ āĻāĻžāϞā§āĨ¤
đš 18. āĻāĻ āĻĻāĻŋāύ⧠āĻāĻāĻāĻŋ āĻŽā§āĻļāĻŋāύ⧠āĻāϝāĻŧāĻāĻŋ Pile āĻāϰāĻž āϏāĻŽā§āĻāĻŦ?
āĻāϤā§āϤāϰ: 50 āĻĢā§āĻā§āϰ āύāĻŋāĻā§ 3āĻāĻŋ, 50 āĻĢā§āĻā§āϰ āĻāĻĒāϰ⧠2āĻāĻŋāĨ¤
đš 19. Pile-āĻāϰ āĻāĻžāϰāĻŦāĻšāύ āĻā§āώāĻŽāϤāĻž āĻā§?
āĻāϤā§āϤāϰ: āĻĒā§āϰāϤāĻŋ āĻŦāϰā§āĻāĻĢā§āĻ Pile āύāĻŋāϰāĻžāĻĒāĻĻā§ āϝ⧠āĻāĻāύ āĻŦāĻšāύ āĻāϰāϤ⧠āĻĒāĻžāϰā§, āϤāĻžāĻā§ Pile-āĻāϰ āĻāĻžāϰāĻŦāĻšāύ āĻā§āώāĻŽāϤāĻž āĻŦāϞā§āĨ¤
đš 20. Pile āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻā§āύ āĻšāϝāĻŧ? Pre-cast Pile āϏā§āĻĨāĻžāύāĻžāύā§āϤāϰ āĻāϰāϞ⧠āĻā§ āϞāĻā§āώā§āϝ āϰāĻžāĻāϤ⧠āĻšāĻŦā§?
āĻāϤā§āϤāϰ: āĻŽāĻžāĻāĻŋāϰ Bearing Capacity āĻāĻŽ āĻšāϞ⧠Pile āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻšāϝāĻŧāĨ¤ Pre-cast Pile āϏā§āĻĨāĻžāύāĻžāύā§āϤāϰā§āϰ āϏāĻŽāϝāĻŧ:
āĻāĻžāĻāĻž āύāĻž āϝāĻžāϝāĻŧ, āϤāĻžāĻ C.G āĻ āĻŋāĻ āĻāϰ⧠āĻāϝāĻŧā§āϝāĻžāϰ āĻŦāĻžāĻāϧāϤ⧠āĻšāĻŦā§āĨ¤
Accident āĻāĻĄāĻŧāĻžāϤ⧠āϏāϤāϰā§āĻ āĻĨāĻžāĻāϤ⧠āĻšāĻŦā§āĨ¤
đš 21. āĻĢā§āĻāĻŋāĻ-āĻāϰ āĻŽāĻžāĻāĻŋ āĻāĻžāĻāĻžāϰ āĻāĻā§ āĻāĻŋ āĻāĻžāĻŦāĻž āĻāĻāĻŋāϤ?
āĻāϤā§āϤāϰ: āĻāĻā§āϰ āĻĢā§āĻāĻŋāĻ-āĻāϰ āĻŽāĻžāĻāĻŋ āĻāĻā§ āĻāĻžāĻāĻž āĻāĻāĻŋāϤ āĻāĻŦāĻ āĻŽāĻžāĻāĻŋāϰ āĻ
āĻŦāϏā§āĻĨāĻžāϰ āĻāĻĒāϰ āĻāĻŋāϤā§āϤāĻŋ āĻāϰ⧠Safety āĻŦā§āϝāĻŦāϏā§āĻĨāĻž āύāĻŋāϤ⧠āĻšāĻŦā§āĨ¤
đš 22. Safe Bearing Capacity of Soil āĻāĻŋ?
āĻāϤā§āϤāϰ: āĻāĻŽāĻŋāϰ āĻāĻĒāϰ āϝāϤ āĻāĻāύ āύāĻŋāϰāĻžāĻĒāĻĻā§ āĻāĻžāĻĒāĻžāύ⧠āϝāĻžāϝāĻŧ āϝāĻžāϤ⧠āĻĢāĻžāĻāύā§āĻĄā§āĻļāύ āĻŦāϏ⧠āϝāĻžāĻāϝāĻŧāĻžāϰ āĻāϝāĻŧ āύāĻž āĻĨāĻžāĻā§, āϤāĻžāĻā§ Soil-āĻāϰ Safe Bearing Capacity āĻŦāϞā§āĨ¤
đš 23. Shoring āĻāĻŋ?
āĻāϤā§āϤāϰ: āϰāĻžāϏā§āϤāĻž āĻŦāĻž āĻā§āĻāĻāĻŋ āĻŽāĻžāĻāĻŋ āϧāϰ⧠āϰāĻžāĻāĻžāϰ āĻāύā§āϝ āĻĻā§āĻ āĻĒāĻžāĻļā§ āϞāĻŽā§āĻŦāĻž āĻāĻžāĻ ā§āϰ āϤāĻā§āϤāĻž āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻāϰāĻžāϰ āĻĒāĻĻā§āϧāϤāĻŋāĻā§ Shoring āĻŦāϞā§āĨ¤
đš 24. Vi****or Roller-āĻāϰ āĻŦāĻŋāĻļā§āώāϤā§āĻŦ āĻā§?
āĻāϤā§āϤāϰ: āĻāĻžāϞ⧠āĻāϰāϞ⧠āĻāĻāĻŋ āĻā§āϰāĻŽāĻžāĻāϤ Vibrate āĻāϰā§, āĻĢāϞ⧠āĻŽā§āĻā§, āϰāĻžāϏā§āϤāĻž āĻŦāĻž āĻŦāĻžāϞāĻŋ Properly Compacted āĻšāϝāĻŧāĨ¤
đš 25. Foundation āĻā§?
āĻāϤā§āϤāϰ: Building-āĻāϰ āύā§āĻā§āϰ āĻ
āĻāĻļ āϝāĻž āϏāĻŽāϏā§āϤ āϞā§āĻĄ āĻŽāĻžāĻāĻŋāϤ⧠āϏāĻŽāĻāĻžāĻŦā§ āĻĒā§āĻāĻā§ āĻĻā§āϝāĻŧāĨ¤ Footing āĻ
āĻŦāĻļā§āϝāĻ āĻļāĻā§āϤ āĻŽāĻžāĻāĻŋāϤ⧠āĻŦāϏāĻžāϤ⧠āĻšāĻŦā§āĨ¤
đš 26. Footing āϏāĻžāϧāĻžāϰāĻŖāϤ āĻāϤ āĻĒā§āϰāĻāĻžāϰ?
āĻāϤā§āϤāϰ: ā§Š āĻĒā§āϰāĻāĻžāϰ:
Spread Footing
Combined Footing
Mat/ Raft Footing
đš 27. R.C.C āĻā§?
āĻāϤā§āϤāϰ: Reinforced Cement Concrete, āĻ
āϰā§āĻĨāĻžā§ Concrete + SteelāĨ¤ āĻāĻāĻŋ āĻāĻžāύ āĻ āĻāĻžāĻĒ āĻāĻāϝāĻŧāĻ āϏāĻšā§āϝ āĻāϰāϤ⧠āĻĒāĻžāϰā§āĨ¤
đš 28. Ferro-Cement āĻāĻŋ?
āĻāϤā§āϤāϰ:
Expended Metal āĻŦāĻž Coil Rod āĻĻāĻŋāϝāĻŧā§ āĻāĻžāĻāĻāĻž āϤā§āϰāĻŋ āĻāϰ⧠Cement āĻāĻŦāĻ Sylhet Sand
āĻĻāĻŋāϝāĻŧā§ āĻšāĻžāϞāĻāĻž āĻāĻžāϏā§āĻāĻŋāĻ āĻāϰāĻžāĨ¤ āϏāĻžāϧāĻžāϰāĻŖāϤ 1" āĻĨā§āĻā§ 2" Wall āϤā§āϰāĻŋ āĻ āĻā§āϝāĻžāĻā§āĻā§ āĻŦā§āϝāĻŦāĻšāĻžāϰ
āĻšāϝāĻŧāĨ¤
đš 29. Curing āĻā§ āĻāĻŦāĻ āĻā§āύ?
āĻāϤā§āϤāϰ: Concrete, Brickwork āĻŦāĻž Plastering-āĻāϰ āĻĄāĻŋāĻšāĻžāĻāĻĄā§āϰā§āĻļāύ āϰā§āϧ āĻāϰāϤ⧠āĻĻāĻŋāĻ¨ā§ ā§Šâā§Ē āĻŦāĻžāϰ āĻĒāĻžāύāĻŋ āĻĻā§āĻāϝāĻŧāĻžāĨ¤ āĻāĻāĻŋ āĻļāĻā§āϤ āĻ āĻā§āĻāϏāĻ āύāĻŋāϰā§āĻŽāĻžāĻŖ āύāĻŋāĻļā§āĻāĻŋāϤ āĻāϰā§āĨ¤
đš 30. Segregation āĻā§?
āĻāϤā§āϤāϰ: āĻŦā§āĻļāĻŋ Water Cement Ratio āĻšāϞ⧠āĻŽāĻŋāĻļā§āϰāĻŖ āĻĢā§āϞāĻžāϰ āĻĒāϰ āϏāĻŋāĻŽā§āύā§āĻ-āĻŦāĻžāϞ⧠āĻāϞāĻžāĻĻāĻž āĻšāĻāϝāĻŧāĻžāĨ¤ āĻāĻāĻŋ Segregation āύāĻžāĻŽā§ āĻĒāϰāĻŋāĻāĻŋāϤāĨ¤
đš 31. Bleeding āĻā§?
āĻāϤā§āϤāϰ: āĻāĻāĻŋ Segregation-āĻāϰ āĻāĻāĻāĻŋ āϧāϰāύāĨ¤ āĻāĻāĻā§āϰāĻŋāĻ āĻĨā§āĻā§ āϏāĻŋāĻŽā§āύā§āĻ āĻĨāĻŋāϤāĻŋāϝāĻŧā§ āϝāĻžāĻāϝāĻŧāĻžāĻā§ Bleeding āĻŦāϞā§āĨ¤ āĻāϰ āĻĢāϞ⧠āĻāĻāĻā§āϰāĻŋāĻ āĻĻā§āϰā§āĻŦāϞ āĻšāϝāĻŧ āĻāĻŦāĻ āĻāĻĒāϰāĻŋāĻāĻžāĻā§ Hair Crack āĻĻā§āĻāĻž āĻĻāĻŋāϤ⧠āĻĒāĻžāϰā§āĨ¤
đš 32. 100 cft āĻāĻžāĻā§āϰ āĻāύā§āϝ āĻāĻāĻā§āϰāĻŋāĻ āĻāĻĒāĻžāĻĻāĻžāύ āύāĻŋāϰā§āϧāĻžāϰāĻŖ (1:2:4 āĻ
āύā§āĻĒāĻžāϤ)
āĻāϤā§āϤāϰ:
Dry Condition: 100 cft
Wet Condition: 100 Ã 1.5 = 150 cft
Cement = 150 à (1/7) à 0.8 â 17.5 āĻŦā§āϝāĻžāĻ
Sand = 48 cft
Aggregate = 85.5 cft
đš 33. Column āĻāϤ āĻĒā§āϰāĻāĻžāϰ?
āĻāϤā§āϤāϰ: āĻĒā§āϰāϧāĻžāύāϤ ⧍ āĻĒā§āϰāĻāĻžāϰ:
Tied Column
Spiral Column
đš 34. āĻāĻāĻā§āϰāĻŋāĻ-āĻāϰ āĻāĻĒāĻžāĻĻāĻžāύāĻā§āϞ⧠āĻā§ āĻā§?
āĻāϤā§āϤāϰ:
āĻā§āϰā§āϏ Aggregate (Stone Chips / Brick Chips)
āĻĢāĻžāĻāύ Aggregate (Sand)
āϏāĻŋāĻŽā§āύā§āĻ
āĻĒāĻžāύāĻŋ
đš 35. āĻāĻāĻā§āϰāĻŋāĻ āĻāĻĒāĻžāĻĻāĻžāύā§āϰ âāϰāĻžāĻāĻžâ āĻā§?
āĻāϤā§āϤāϰ: āĻā§āϰā§āϏ Aggregate (Stone Chips / Brick Chips)
đš 36. 200 cft-āĻ 2% āϰāĻĄ āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻšāϞ⧠āϰāĻĄā§āϰ āĻĒāϰāĻŋāĻŽāĻžāĻŖ (kg)?
āĻāϤā§āϤāϰ: 200 à 2 à 490 = 1960 lbs â 882 kg
đš 37. R.C.C āĻāĻžāĻā§ āĻā§āύ āĻĒāĻžāύāĻŋ āĻŦā§āϝāĻŦāĻšāĻžāϰ?
āĻāϤā§āϤāϰ: āĻāĻžāĻŦāĻžāϰ āϝā§āĻā§āϝ āĻŦāĻž āĻāĻžāĻāĻžāĻāĻžāĻāĻŋ āĻŽāĻžāύā§āϰ āĻĒāĻžāύāĻŋ
đš 38. āĻĒā§āϰāϤāĻŋ āĻŦā§āϝāĻžāĻ āϏāĻŋāĻŽā§āύā§āĻā§ āĻĒāĻžāύāĻŋ āĻāϤ āϞāĻžāĻā§?
āĻāϤā§āϤāϰ: 23 āϞāĻŋāĻāĻžāϰ â 17.5 āĻŦā§āϝāĻžāĻā§āϰ āĻāύā§āϝ â 402 āϞāĻŋāĻāĻžāϰ
đš 39. High strength steel-āĻāϰ āϏāĻžāĻĨā§ āĻā§āύ āĻāĻāĻā§āϰāĻŋāĻ āĻŦā§āϝāĻŦāĻšāĻžāϰ?
āĻāϤā§āϤāϰ: High strength steel-āĻāϰ āϏāĻžāĻĨā§ High strength concrete
đš 40. Water Cement Ratio āĻā§?
āĻāϤā§āϤāϰ: Water āĻ Cement-āĻāϰ āĻ
āύā§āĻĒāĻžāϤāĻā§ Water Cement Ratio āĻŦāϞā§
đš 41. āϏāĻžāϧāĻžāϰāĻŖ Water Cement Ratio āĻāϤ?
āĻāϤā§āϤāϰ: 0.4 āĻĨā§āĻā§ 0.5
đš 42. āĻāĻāĻā§āϰāĻŋāĻ āĻŽāĻŋāĻļā§āϰāĻŖā§ Water Cement Ratio āĻāĻŋāĻāĻžāĻŦā§ āύāĻŋāϰā§āĻŖāϝāĻŧ?
āĻāϤā§āϤāϰ: Ratio ⤠0.5 â āϏāĻŽāĻĒāϰāĻŋāĻŽāĻžāĻŖ āĻāĻāĻā§āϰāĻŋāĻā§ āϏāĻŋāĻŽā§āύā§āĻā§āϰ āĻāĻāύ āĻ
āύā§āϝāĻžāϝāĻŧā§ āĻšāĻŋāϏāĻžāĻŦ āĻāϰāĻž āĻšāϝāĻŧ
đš 43. āĻāĻāĻā§āϰāĻŋāĻ āĻŽāĻŋāĻļā§āϰāĻŖā§ āĻĒāĻžāύāĻŋ āĻŦā§āĻļāĻŋ āĻšāϞ⧠āĻāĻŋ āĻāϰāϤ⧠āĻšāĻŦā§?
āĻāϤā§āϤāϰ: Water Cement Ratio āĻ āĻŋāĻ āϰāĻžāĻāϤ⧠cement āĻŽā§āĻļāĻžāύ⧠āĻāĻŦāĻ āĻĸāĻžāϞāĻžāĻ āĻāĻĒāϝā§āĻā§ āĻāϰāϤ⧠āĻšāĻŦā§
đš 44. Slump Cone-āĻāϰ āϏāĻžāĻāĻ āĻāϤ?
āĻāϤā§āϤāϰ:
āĻāĻĒāϰā§āϰ āĻĄāĻžāϝāĻŧāĻž: 4"
āύā§āĻā§āϰ āĻĄāĻžāϝāĻŧāĻž: 8"
āĻāĻā§āĻāϤāĻž: 12"
đš 45. Cylinder-āĻāϰ āϏāĻžāĻāĻ
āĻāϤā§āϤāϰ:
āĻĒā§āϰā§āĻŦā§: 6" āĻĄāĻžāϝāĻŧāĻž à 12" āϞāĻŽā§āĻŦāĻž
āĻŦāϰā§āϤāĻŽāĻžāύā§: 4" āĻĄāĻžāϝāĻŧāĻž à 8" āϞāĻŽā§āĻŦāĻž
đš 46. Rod Test-āĻāϰ sample āĻāĻŋāĻāĻžāĻŦā§ āĻĒāĻžāĻ āĻžāϤ⧠āĻšāĻŦā§?
āĻāϤā§āϤāϰ: āĻāĻāĻ āĻĄāĻžāϝāĻŧāĻžāϰ ā§§ āĻŽāĻŋāĻāĻžāϰ āϞāĻŽā§āĻŦāĻž ā§ŠāĻāĻŋ āϰāĻĄ āĻā§āĻā§ āĻĒāĻžāĻ āĻžāϤ⧠āĻšāĻŦā§
đš 47. āϏāĻŋāĻŽā§āύā§āĻ āĻĒāϰā§āĻā§āώāĻž āĻā§ āĻā§?
āĻāϤā§āϤāϰ:
Compressive Strength
Bonding Power
Initial Setting Time
Final Setting Time
Fineness Test
đš 48. ACI Code āĻ
āύā§āϝāĻžāϝāĻŧā§ Slab-āĻ āĻĻā§āĻ āϰāĻĄā§āϰ āĻĻā§āϰāϤā§āĻŦ?
āĻāϤā§āϤāϰ: Slab Thickness-āĻāϰ āĻĻā§āĻŦāĻŋāĻā§āĻŖ; āĻāĻĻāĻžāĻšāϰāĻŖ: 5" Slab â 9â10"
đš 49. Curing Period
āĻāϤā§āϤāϰ:
R.C.C: 28 āĻĻāĻŋāύ
Brick wall: 7 āĻĻāĻŋāύ
Plastering: 7 āĻĻāĻŋāύ
đš 50. āϰāĻĄā§āϰ Lap āĻŦāĻž Joint āĻā§āĻĨāĻžāϝāĻŧ?
āĻāϤā§āϤāϰ:
Column: L/4-āĻāϰ āĻŦāĻžāĻāϰ⧠(āĻŽāĻžāĻā§ āύāϝāĻŧ)
Beam: Bottom Rod â Span-āĻāϰ L/3 āĻŽāϧā§āϝā§; Top Rod â Span-āĻāϰ L/3 āĻĒāϰā§
Slab: Bottom Rod â Column Trip āĻŽāϧā§āϝā§; Top Rod â Middle Trip; Extra Top-āĻ āύāĻž
đš 51. Tied Rod āĻ Spiral Column-āĻāϰ Vertical Rod
āĻāϤā§āϤāϰ:
Tied Rod: āύā§āϝā§āύāϤāĻŽ 4 āĻāĻŋ
Spiral Column: āύā§āϝā§āύāϤāĻŽ 6 āĻāĻŋ
Column-āĻ 16mm-āĻāϰ āύāĻŋāĻā§ āϰāĻĄ āĻŦā§āϝāĻŦāĻšāĻžāϰ āϝāĻžāĻŦā§ āύāĻž
đš 52. Cantilever āĻ
āĻāĻļā§ Shutter āĻā§āϞāĻžāϰ āĻĒāĻĻā§āϧāϤāĻŋ
āĻāϤā§āϤāϰ: Free āĻĻāĻŋāĻ āĻĨā§āĻā§ āϧāĻžāĻĒā§ āϧāĻžāĻĒā§ āĻāĻŋāϤāϰā§āϰ āĻĻāĻŋāĻā§ āĻā§āϞāϤ⧠āĻšāĻŦā§
đš 53. Slab-āĻāϰ Shutter āĻā§āϞāĻžāϰ āĻĒāĻĻā§āϧāϤāĻŋ
āĻāϤā§āϤāϰ: Span-āĻāϰ middle āĻĨā§āĻā§ āĻāĻžāϰāĻĻāĻŋāĻā§ props āĻā§āϞ⧠beam-āĻāϰ āĻĻāĻŋāĻā§ āϝā§āϤ⧠āĻšāĻŦā§
đš 54. Shutter āĻā§āϞāĻžāϰ āϏāĻŽāϝāĻŧ
āĻāϤā§āϤāϰ:
Beam: 28 āĻĻāĻŋāύ
Slab: 21 āĻĻāĻŋāύ (āĻā§āĻ span â 18 āĻĻāĻŋāύ)
Vertical member: 72 āĻāύā§āĻāĻž
đš 55. Shuttering āĻāĻā§āĻāϤāĻž 12" āĻāϰ āĻāĻĒāϰ⧠āĻšāϞ⧠āĻāĻŋ āĻāϰāϤ⧠āĻšāĻŦā§?
āĻāϤā§āϤāϰ: Horizontal bracing āĻĻāĻŋāϤ⧠āĻšāĻŦā§, props āĻšāĻŋāϏā§āĻŦā§ MS Pipe āĻŦāĻž Shalballi āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻāϰāϤ⧠āĻšāĻŦā§
đš 56. 1 cft āϞā§āĻšāĻž āĻāĻāύ?
āĻāϤā§āϤāϰ: 490 lbs
đš 57. 1 āĻŽāύ āĻā§āύ āĻāϝāĻŧāϤāύ?
āĻāϤā§āϤāϰ: 2.25 cft
đš 58. 1 cft āϏāĻŋāĻŽā§āύā§āĻā§āϰ āĻāĻāύ?
āĻāϤā§āϤāϰ: 90 lbs
đš 59. Cantilever Beam āϏāϰā§āĻŦā§āĻā§āĻ Moment āĻā§āĻĨāĻžāϝāĻŧ?
āĻāϤā§āϤāϰ: Support-āĻ
đš 60. Sunshed-āĻāϰ Binder Rod āĻā§āĻĨāĻžāϝāĻŧ āĻĻāĻŋāϤ⧠āĻšāϝāĻŧ?
āĻāϤā§āϤāϰ: Main Rod-āĻāϰ āύāĻŋāĻā§
đš 61. 100 ft Easing-āĻāϰ āĻāύā§āϝ āĻāĻā§āϰ āϏāĻāĻā§āϝāĻž
āĻāϤā§āϤāϰ: 250â270
đš 62. 100 sqft Soling-āĻāϰ āĻāύā§āϝ āĻāĻ
āĻāϤā§āϤāϰ: 300â336
đš 63. 100 sqft Herring Bone Bond-āĻāϰ āĻāύā§āϝ āĻāĻ
āĻāϤā§āϤāϰ: 500â550
đš 64. 100 sft, 5" Wall-āĻāϰ āĻāύā§āϝ āĻāĻ
āĻāϤā§āϤāϰ: 480â500
đš 65. 100 cft, 10" Wall-āĻāϰ āĻāύā§āϝ āĻāĻ
āĻāϤā§āϤāϰ: 1080
đš 66. 100 cft Khoa āĻŦāĻžāύāĻžāϤ⧠āĻāĻ
āĻāϤā§āϤāϰ: 1050
đš 67. Frog Mark āĻā§?
āĻāϤā§āϤāϰ: āĻāĻā§āϰ āĻĒāĻŋāĻ ā§ āύāĻŋāϰā§āĻŽāĻžāϤāĻžāϰ āύāĻžāĻŽ; Bonding-āĻāϰ key āĻšāĻŋāϏā§āĻŦā§ āĻāĻžāĻ āĻāϰā§
đš 68. āĻāϞāĻāĻžāĻĻā§ āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻāϰāĻž āĻāĻĒāĻžāĻĻāĻžāύ āĻ āĻ
āύā§āĻĒāĻžāϤ
āĻāϤā§āϤāϰ: Slaked Lime : Surki : Khoa â 2:2:7
đš 69. āĻāϞāĻāĻžāĻĻ āĻ Parapet Wall āϏāĻāϝā§āĻā§āϰ āĻŦāĻžāĻāĻāĻž āĻ
āĻāĻļ
āĻāϤā§āϤāϰ: āĻā§āύā§āĻĄā§
đš 70. āĻāĻžāĻā§āϰ āĻŦā§āϏ āĻāĻŋāĻāĻžāĻŦā§ āύāĻŋāϰā§āĻŖā§?
āĻāϤā§āϤāϰ: āĻāĻžāĻ ā§āϰ cross-section āĻāϰ ring āĻāĻŖāύāĻž āĻāϰā§
đš 71. āĻā§āĻāĻžāĻ ā§āϰ Groove Size
āĻāϤā§āϤāϰ: 1.5" à S
đš 72. Door Frame (Width 7")-āĻ Clamp
āĻāϤā§āϤāϰ: āĻāĻ āϏāĻžāĻāĻā§ 4āĻāĻŋ â āĻĻā§āĻ āϏāĻžāĻāĻā§ 8āĻāĻŋ
đš 73. āĻŦāĻžāĻāĻžāϰ⧠Flush Door Shutter Size
āĻāϤā§āϤāϰ: 39", 36", 33", 30", 27", 24", 21"
đš 74. āĻāĻžāϞ⧠āĻāĻžāĻ ā§āϰ āĻā§āĻŖāĻžāĻŦāϞā§
āĻāϤā§āϤāϰ: āϏā§āĻĨāĻžāϝāĻŧāĻŋāϤā§āĻŦ, āĻļāĻā§āϤāĻŋ, āĻĒā§āϰāĻžāĻā§āϤāĻŋāĻ āĻĻā§āώāĻŽā§āĻā§āϤ, āĻāĻā§āĻā§āĻŦāϞ āϰāĻ, āĻŽāϏā§āĻŖ āĻĒā§āώā§āĻ , āϰāϏ āĻŽā§āĻā§āϤ
đš 75. Veneer āĻā§?
āĻāϤā§āϤāϰ: āĻĒāĻžāϤāϞāĻž āĻāĻžāĻ ā§āϰ āĻĒāĻžāϤ (1/4"â1/16")
đš 76. Plywood āĻā§?
āĻāϤā§āϤāϰ: Veneer āĻĨā§āĻā§ āĻĒā§āϰā§, Packing Box, Partition āĻāϤā§āϝāĻžāĻĻāĻŋ āϤā§āϰāĻŋāϤ⧠āĻŦā§āϝāĻŦāĻšāĻžāϰ
đš 77. Hard Board āĻā§?
āĻāϤā§āϤāϰ: āĻāĻžāĻ ā§āϰ āϧā§āϞ⧠āĻ āĻāĻ āĻž āĻŽāĻŋāĻļāĻŋā§ā§ āĻĒā§āϰā§āϏāĻžāϰ āĻĻāĻŋāϝāĻŧā§ āϤā§āϰāĻŋ āĻŦā§āϰā§āĻĄ
đš 78. āĻāĻžāĻ āĻāĻžāĻāĻžāϰ āϏāĻŽāϝāĻŧ
āĻāϤā§āϤāϰ: āĻļā§āϤāĻāĻžāϞ
đš 79. 4 āĻĒā§āϰāĻāĻžāϰ āĻĻāϰāĻāĻž
āĻāϤā§āϤāϰ: āĻĄāĻŋāĻāĻžāĻāύ, āĻĒā§āϝāĻžāύā§āϞ, āĻĢā§āϞāĻžāĻļ, āϏāϞāĻŋāĻĄ āĻĻāϰāĻāĻž
đš 80. Socket āĻ Ni**le āĻĒāĻžāϰā§āĻĨāĻā§āϝ
āĻāϤā§āϤāϰ: Socket â āĻāĻŋāϤāϰ⧠āĻĨā§āϰā§āĻĄ, Ni**le â āĻŦāĻžāĻāϰ⧠āĻĨā§āϰā§āĻĄ
đš 81. Union Socket āĻ Socket āĻĒāĻžāϰā§āĻĨāĻā§āϝ
āĻāϤā§āϤāϰ: Union Socket â ā§Š āĻ
āĻāĻļ; āĻā§āϞāĻžāϰ āϏā§āĻŦāĻŋāϧāĻžāĨ¤ Socket â ā§§ āĻ
āĻāĻļ; āĻļā§āϧ⧠jointāĨ¤
đš 82. Elbows āĻ Bend āĻĒāĻžāϰā§āĻĨāĻā§āϝ
āĻāϤā§āϤāϰ: Elbows â 90°; Head loss āĻŦā§āĻļāĻŋ
Bend â āĻ
āϰā§āϧāĻāύā§āĻĻā§āϰāĻžāĻā§āϤāĻŋ; Head loss āĻāĻŽ
đš 83. UPVC āĻāĻŦāĻ PVC āĻĒāĻžāϰā§āĻĨāĻā§āϝ
āĻāϤā§āϤāϰ: UPVC â Unplasticized, āĻāĻā§āύ⧠āĻŦāĻĻāϞāĻžāύ⧠āϝāĻžā§ āύāĻž
PVC â Plasticized, āĻāĻā§āύ⧠āϤāĻžāĻĒ āĻĻāĻŋāϝāĻŧā§ āĻāĻāĻžāϰ āĻĒāϰāĻŋāĻŦāϰā§āϤāύ āĻāϰāĻž āϝāĻžāϝāĻŧ
đš 84. āĻāĻāĻāύ āĻŽāĻžāύā§āώā§āϰ āĻĻā§āύāĻŋāĻ āĻĒāĻžāύāĻŋ āĻŦā§āϝāĻŦāĻšāĻžāϰ
āĻāϤā§āϤāϰ: āĻĒā§āϰāĻžāϝāĻŧ ā§Šā§Ļ āĻā§āϝāĻžāϞāύ
đš 85. 1 cft āĻāϝāĻŧāϤāĻāĻžāϰ āĻĒāĻžāϤā§āϰ⧠āĻĒāĻžāύāĻŋ
āĻāϤā§āϤāϰ: 6.25 āĻā§āϝāĻžāϞāύ
đš 86. Reservoir (Water Tank) āϏāĻžāĻāĻ āύāĻŋāϰā§āϧāĻžāϰāĻŖ
āĻāϤā§āϤāϰ: Underground â ⧍ āĻĻāĻŋāύā§āϰ āĻŽāĻā§āĻĻ; Overhead â ā§§ āĻĻāĻŋāύā§āϰ āĻŽāĻā§āĻĻ, āϞā§āĻāϏāĻāĻā§āϝāĻžāϰ āĻāĻĒāϰ āĻāĻŋāϤā§āϤāĻŋ āĻāϰā§
đš 87. PVC/UPVC/CPVC āĻĒāĻžāĻāĻĒ Joint
āĻāϤā§āϤāϰ: Solution āĻŦāĻž āĻāĻžāĻŽ āĻĻāĻŋāϝāĻŧā§ Joint
đš 88. PPR āĻĒāĻžāĻāĻĒ Joint
āĻāϤā§āϤāϰ: Heat Machine āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻāϰ⧠āϤāĻžāĻĒ āĻĻāĻŋāϝāĻŧā§ Joint
đš 89. āĻĒāĻžāύāĻŋāϰ āϞāĻžāĻāύ āĻāϤ āĻĒā§āϰā§āϏāĻžāϰ⧠āĻā§āĻ?
āĻāϤā§āϤāϰ: Pressure Machine āĻĻāĻŋā§ā§ 50 Psi, āĻāĻŽāĻĒāĻā§āĻˇā§ ā§Š āĻāĻŖā§āĻāĻž
đš 90. Sewerage āĻāĻŋ āĻāĻŦāĻ āĻĒā§āϰāĻāĻžāϰ
āĻāϤā§āϤāϰ: āĻļāĻšāϰā§āϰ āĻŦā§āϝāĻŦāĻšā§āϤ āϤāϰāϞ āĻŽāϝāĻŧāϞāĻž â Sewerage
āĻĒā§āϰāĻāĻžāϰ: (i) Sanitary Sewerage, (ii) Industrial Sewerage