Sovereign Plaster
04/02/2025
Some hand trowel work completed in a Rumpus room/garage with rake ceiling in Warragul.
04/02/2025
Before and after of a re-sheet/repair to a section of water damaged ceiling completed in Drouin.
04/02/2025
Kitchen/living area of another new build completed start to finish in Venus Bay.
Room is nearly 10m long by 4.8m wide with the high side of the rake measuring 3.5m high.
All trowled by hand, no machines.
04/02/2025
Some before, during and after of a dividing wall and revealed doorway sheeted and set up with metal angles.
All trowled by hand and new cornice joined to existing to create built in robes in the master bedroom of a home in Boolarra.
04/02/2025
This is the main living area on the 2nd story of a new build completed start to finish in Venus Bay
Room is 10.8m long x 5.5m wide with the high side of the rake measuring 3.5m high.
All trowled by hand, no machines.
04/02/2025
New section of ceiling installed and joined to existing after a fernery was removed and external wall was extended at a home in Willow Grove.
04/02/2025
Some cornice work in a small bathroom renovation in Boolarra
04/02/2025
Some trowel work completed in a school auditorium in Traralgon.
This ceiling is nearly 10x10m in surface area and 8m high.
The wall is just on 8m wide and 6m high. All trowled by hand from a scissor lift.
04/02/2025
Little trowel job in shed to granny flat conversion completed near Stratford. All trowled by hand.
04/02/2025
A small patch where an exhaust fan was removed.
04/02/2025
Little nib wall trowel up in an aged care facility near Mornington.
Click here to claim your Sponsored Listing.