CBR Outdoor Projects
At CBR Outdoor Projects, we recently completed a rubber softfall installation—perfect for creating a safe, durable and low-maintenance surface.
The process starts with excavation, preparing and levelling the base. We then mix and lay the rubber, trowelling it smooth to create a seamless, compliant finish.
The end result is a safe, long-lasting surface ideal for playgrounds and high-traffic areas.
Get in touch if you’re looking to upgrade your space 👍
20/03/2026
Another awesome project completed by the team at CBR Outdoor Projects 👷♂️🌱
We recently transformed this local primary school outdoor space with brand new artificial turf, creating a safe, clean and low-maintenance area for the kids to enjoy all year round.
From excavation and base preparation through to final install, this job was all about delivering a durable surface that can handle high foot traffic while still looking great 👌
✅ Improved safety & usability
✅ All-weather play area
✅ Clean, modern finish
Great to see the space come to life and ready for students to enjoy!
If you’re looking to upgrade your outdoor area — whether it’s a school, commercial space or your own backyard — get in touch with the team today.
📞 Contact us for a quote
28/11/2025
This job in Farrer required excavation of the old lawn, installation of new fully automatic irrigation system built using PVC pipe, Hunter MP rotator sprinklers all on a swing arm riser, new soil then laid with Canturf Canberra Blend 👍🏼
25/11/2025
Artificial Turf Prep then Installation at Bungendore ✅
21/11/2025
Footing for an under ground carpark.
This job required the following:
-Cut through the existing concrete slab
-Excavate to 600mm depth
-Drill into the existing slab to chemset metal dowels to tie the slabs together
-Custom build then install new rio cage to strengthen concrete
-Pour & finish the new slab (needed to ferry in the concrete due to height restrictions in carpark)
03/08/2025
CBR Outdoor Projects is pleased to announce a new addition to our fleet of modern Landscaping Equipment. The Isuzu FRR 500 tipper truck. This was chosen for its reliability, productive payload capacity and yet still non invasive on residential and commercial job sites.
We, at CBR Outdoor Projects are always looking to improve and invest in our fleet for safety and cost savings for customers and our business.
For all your landscaping and turf requirements, feel free to reach out for a free quote.
20/07/2025
Final zone at the school kindergarten area to get an upgrade. It received 3 crawling tunnels locked in by 6 sandstone logs and a fresh layer of mulch ✅
14/07/2025
Before, during and after pictures from a sandpit makeover at a primary school, it is now surrounded by Terracotta coloured Rubber Soft Fall which is safer for the kids and easier to keep clean ✅
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
Opening Hours
| Monday | 8am - 4pm |
| Tuesday | 8am - 4pm |
| Wednesday | 8am - 4pm |
| Thursday | 8am - 4pm |
| Friday | 8am - 4pm |