Photos from Construkt Building's post 03/05/2026

Update on or project in Gordon.

- Existing house internals stripped out.
- Garage base slab complete. Bricked up to next slab height with steel installed ready for bondek above. New area to be kitchen/ pantry and dining on suspended slab.
- Front and rear extension areas bricked up/ filled in ready for next slabs.

Once next slabs complete the whole roof structure comes off ready to be re framed/ new trusses to take its new shape.

Photos from Construkt Building's post 05/11/2025

New build underway in Chisholm. Total area of 207m2 to include 3 bedrooms, 2 bathrooms, study, under roofline double carport and alfresco.

Photos from Construkt Building's post 12/09/2025

Project in Theodore complete and ready for handover. We took this 3 bedroom / 1 bathroom property and turned it into a 4 bedroom + study / 2 bathroom home.

- Extension of 59m2 included new large living/dining room, master bedroom, walk-in robe and ensuite. 2.7m ceilings to new areas.
- Renovation to existing property including full repaint, new flooring, new robes, new air-con system and new double glazed windows throughout.
- Merbau deck to rear connecting new areas to backyard.

As always clients were a pleasure to work for and we are sure they will love their new family home for years to come.

05/06/2025

Busy few days at our Theodore extension. Lock up stage complete, ceilings battened, insulation and all sheeted.